Skip to main content

Michael Baker International to study traffic congestion in Los Angeles

Los Angeles County Metropolitan Transportation Authority (Metro) has awarded Michael Baker International a contract to study the I-605/SR-91 interchange, identify improvements and widen a particularly congested three-mile stretch of westbound SR-91 in Los Angeles. The project spans westbound SR-91 from the vicinity of Shoemaker Avenue to the I-605/SR-91 interchange, used by 270,000 vehicles a day. It also includes improvements to the Norwalk, Pioneer and Bloomfield local interchanges within the Gateway
February 8, 2017 Read time: 1 min
1795 Los Angeles County Metropolitan Transportation Authority (Metro) has awarded Michael Baker International a contract to study the I-605/SR-91 interchange, identify improvements and widen a particularly congested three-mile stretch of westbound SR-91 in Los Angeles.

The project spans westbound SR-91 from the vicinity of Shoemaker Avenue to the I-605/SR-91 interchange, used by 270,000 vehicles a day. It also includes improvements to the Norwalk, Pioneer and Bloomfield local interchanges within the Gateway Cities, a 200-square mile, 15-community region, located in the southeast area of Los Angeles County and home to approximately two million people.

The Michael Baker team has identified that congestion in this area is the result of insufficient SR-91 freeway mainline capacity, inadequate capacity of the existing two lane connector for the westbound SR-91 to northbound and southbound I-605, and closely spaced freeway entrance and exit ramps.

For more information on companies in this article

Related Content

  • Houston TranStar wins 'Best of Texas' award
    April 25, 2012
    Houston TranStar has been awarded "Most Innovative Use of Technology" by the Centre for Digital Government, a national research and advisory institute on information technology policies and best practices in state and local government, for its cutting-edge Bluetooth-based travel time information system. The new deployment, extending north more than 200 miles along the I-45 North corridor to Dallas, gives TranStar the capability to monitor and manage traffic conditions on this major evacuation route.
  • Asking drivers what information they need: radical but effective
    March 19, 2014
    When Texas A&M Transportation Institute was asked to devise a temporary traveller information system for work zones, it started by asking drivers what they need. Robert Brydia explains the thinking, implementation and results. US Interstate 35 (I-35) runs roughly north–south originating in Laredo, Texas and ends 1,500 miles away in Duluth, Minnesota having passed through Oklahoma, Kansas, Missouri and Iowa. Within Texas the I-35 splits into I-35E and I-35W passing through Dallas and Fort Worth respectiv
  • Washington launches multimodal transportation plan
    October 24, 2014
    Mayor Vincent C. Gray and District Department of Transportation (DDOT) director Matt Brown have released the final US$54 million moveDC Transportation Plan. The plan is a comprehensive, multimodal transportation strategy that outlines policies, programs and capital investments to enhance the District’s transportation network and includes detailed elements or master plans for each mode of travel in the District. The moveDC plan is the culmination of an 18-month process that has involved thousands of resid
  • Jacobs JV awarded contract for California high speed rail
    July 23, 2015
    The Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design. The California High Speed Rail is the first true high-speed rail being constructed in the United S