Skip to main content

McCann participates in M1 smart motorway scheme

Civil and electrical engineering firm McCann will help upgrade a 7.5 mile stretch of a major Midlands route as part of the M1 junction 23a – 25 smart motorway scheme. The project stems from an agreement with Highways England and is intended to reduce congestion and smooth the flow of traffic to improve travel times. Carl Lancaster, operations director for McCann, says: “The finished project will also help to minimise environmental impacts and maximise the capacity of the motorway while ensuring continued
July 16, 2018 Read time: 2 mins
Civil and electrical engineering firm McCann will help upgrade a 7.5 mile stretch of a major Midlands route as part of the M1 junction 23a – 25 smart motorway scheme. The project stems from an agreement with 8101 Highways England and is intended to reduce congestion and smooth the flow of traffic to improve travel times.


Carl Lancaster, operations director for McCann, says: “The finished project will also help to minimise environmental impacts and maximise the capacity of the motorway while ensuring continued driver safety.”

McCann will install 500 lighting columns, 100,000m of lighting cable, 12,000m of lighting duct infrastructure, 40,000m of communication cable and 230 communication cabinets. The company will also install relevant technology to 27 new gantries as well as 13 existing gantries.

The project includes the conversion of the hard shoulder to create a fourth lane between junctions 24 and 25 as well as alterations to accommodate the new lane. Variable speed limits and associated smart motorway systems, CCTV systems and electronic signage, a hardened central reservation and a queue detection system to control congestion will also be implemented.  

McCann will work alongside technology construction companies 2002 Costain and Galliford Try. The project is scheduled to be completed in late 2018.

UTC

Related Content

  • September 13, 2019
    UK organisations disagree on smart motorway ‘dangers’
    A spat over how dangerous the UK’s all lane running (ALR) or ‘smart’ motorways are has broken out between Highways England and a leading motoring organisation. Smart motorways do not have hard shoulders, instead relying on emergency areas at intervals to provide refuge for stranded motorists. The AA recently highlighted Stationary Vehicle Detection, a Highways England report published in March 2016, which looks at how long it takes to identify a vehicle broken down in a live lane of smart motorway when s
  • March 26, 2014
    Navtech Radar’s ClearWay in motorway trials
    Navtech Radar, the world’s leading manufacturer of Radar-based Automatic Incident Detection (AID) solutions for traffic management applications, is supplying its ClearWay radar-based automatic incident detection (AID) solution planned trials on hard shoulder running on strategic motorways in the north of England. The trials are part of a new, all-lane-running smart motorways scheme. For the initial trials, Navtech Radar has supplied ten TS350-X Radars and the sophisticated Witness analytical software. E
  • May 23, 2018
    Drivers urged: ‘Don’t put road workers lives at risk’
    A road junction in Merseyside, UK, has become a hotspot for life-threatening incidents to construction workers, says Highways England. Contractors have reported 23 incidents in two months where their safety has been put at risk by drivers ignoring overnight closures. Road users have driven into roadworks for the £3m improvement project at Switch Island, where the M57, M58 and three A roads all join. One lorry driver travelled through the construction area without stopping - forcing workers to get out
  • March 7, 2023
    Swarco sets up live-lane running on Germany's A8
    System spans 2.8km along hard shoulder of motorway between Karlsruhe and Karlsbad