Skip to main content

McCann participates in M1 smart motorway scheme

Civil and electrical engineering firm McCann will help upgrade a 7.5 mile stretch of a major Midlands route as part of the M1 junction 23a – 25 smart motorway scheme. The project stems from an agreement with Highways England and is intended to reduce congestion and smooth the flow of traffic to improve travel times. Carl Lancaster, operations director for McCann, says: “The finished project will also help to minimise environmental impacts and maximise the capacity of the motorway while ensuring continued
July 16, 2018 Read time: 2 mins
Civil and electrical engineering firm McCann will help upgrade a 7.5 mile stretch of a major Midlands route as part of the M1 junction 23a – 25 smart motorway scheme. The project stems from an agreement with 8101 Highways England and is intended to reduce congestion and smooth the flow of traffic to improve travel times.


Carl Lancaster, operations director for McCann, says: “The finished project will also help to minimise environmental impacts and maximise the capacity of the motorway while ensuring continued driver safety.”

McCann will install 500 lighting columns, 100,000m of lighting cable, 12,000m of lighting duct infrastructure, 40,000m of communication cable and 230 communication cabinets. The company will also install relevant technology to 27 new gantries as well as 13 existing gantries.

The project includes the conversion of the hard shoulder to create a fourth lane between junctions 24 and 25 as well as alterations to accommodate the new lane. Variable speed limits and associated smart motorway systems, CCTV systems and electronic signage, a hardened central reservation and a queue detection system to control congestion will also be implemented.  

McCann will work alongside technology construction companies 2002 Costain and Galliford Try. The project is scheduled to be completed in late 2018.

For more information on companies in this article

Related Content

  • Average driver spends nearly £1,000 and wastes almost five days stuck in traffic a year
    August 18, 2017
    The average UK motorist is being forced to waste £968 and spend 4.9 days stuck in traffic on major roads each year because of congestion, according to new analysis by the Local Government Association (LGA) in its new report, A country in a jam: tackling congestion in our towns and cities. Travel speeds across the country’s local roads continue to decrease, with the average speed on ‘A’ roads now just 25.2 mph, one per cent slower than it was this time last year. Congestion also significantly contributes to
  • Melbourne installs smart road technology
    June 18, 2013
    Work is now underway on installing the latest electronic freeway management technology along Melbourne’s West Gate Freeway in Victoria, Australia, with the entire project to be completed by the middle of next year. Installation of the freeway management system along more of Melbourne’s road network will be fully integrated with the one already in use on the M1 east of Williamstown Road as well as that proposed for the M80 Ring Road, according to Victorian Roads (VicRoads) minister Terry Mulder. “Indeed, ou
  • Traffic to flow freely over world’s widest bridge
    November 13, 2012
    Pete Goldin reports on a new Egis project in Canada, providing open road tolling operations for the widest bridge in the world. A bridge can present a bottleneck in a system of roads or it can support the smooth and unobstructed flow of traffic. Much depends on the bridge design, surrounding infrastructure and tolling system. By adding lanes and deploying open road tolling (ORT), the new Port Mann Bridge located in the metropolitan Vancouver area in British Columbia, will alleviate congestion at one of the
  • Workzone safety can be economically viable
    October 24, 2014
    David Crawford looks how workzone safety can be ‘economically viable’. Highway maintenance is one of the most dangerous construction industry occupations in Europe. Research from The Netherlands on fatal crashes indicates that the risk facing road workzone operatives is ‘significantly higher’ than that for the general construction workforce. A survey carried out by the Highways Agency, which runs the UK’s motorway and trunk road network, has suggested that 20% of road workers have suffered injuries from pa