Skip to main content

McCann participates in M1 smart motorway scheme

Civil and electrical engineering firm McCann will help upgrade a 7.5 mile stretch of a major Midlands route as part of the M1 junction 23a – 25 smart motorway scheme. The project stems from an agreement with Highways England and is intended to reduce congestion and smooth the flow of traffic to improve travel times. Carl Lancaster, operations director for McCann, says: “The finished project will also help to minimise environmental impacts and maximise the capacity of the motorway while ensuring continued
July 16, 2018 Read time: 2 mins
Civil and electrical engineering firm McCann will help upgrade a 7.5 mile stretch of a major Midlands route as part of the M1 junction 23a – 25 smart motorway scheme. The project stems from an agreement with 8101 Highways England and is intended to reduce congestion and smooth the flow of traffic to improve travel times.


Carl Lancaster, operations director for McCann, says: “The finished project will also help to minimise environmental impacts and maximise the capacity of the motorway while ensuring continued driver safety.”

McCann will install 500 lighting columns, 100,000m of lighting cable, 12,000m of lighting duct infrastructure, 40,000m of communication cable and 230 communication cabinets. The company will also install relevant technology to 27 new gantries as well as 13 existing gantries.

The project includes the conversion of the hard shoulder to create a fourth lane between junctions 24 and 25 as well as alterations to accommodate the new lane. Variable speed limits and associated smart motorway systems, CCTV systems and electronic signage, a hardened central reservation and a queue detection system to control congestion will also be implemented.  

McCann will work alongside technology construction companies 2002 Costain and Galliford Try. The project is scheduled to be completed in late 2018.

For more information on companies in this article

Related Content

  • MVIS VMS solution deployed on Highways England’s road upgrade project
    September 4, 2017
    Mobile Visual Information Systems (MVIS) has implemented its DATEX journey time solution (JTS) on Highway’s England’s US$1.9 billion (£1.5billion) A14 Cambridge to Huntingdon upgrade scheme, enabling an average of 85,000 drivers daily who use the 21 mile stretch of road to navigate the roadworks. The project incorporates 26 Bartco UK VMS-Cs variable message signs which display journey times from their locations to the end of the affected stretch of road
  • Making the most of Michigan
    January 9, 2018
    Michigan DoT’s Kirk Steudle takes time out from the ITS World Congress in Montreal to talk to Colin Sowman. Thirty years ago, a professional engineer named Kirk Steudle joined Michigan Department of Transportation (MDoT). Today he’s the state transportation director, responsible for more than 16,000km (10,000 miles) of state highways (including 4,000 bridges), some 2,500 employees and a budget of more than $4 billion. We caught up with Steudle during the ITS World Congress in Montreal and asked how he
  • Indra wins big in Mexico
    December 20, 2013
    Spanish technology multinational Indra has been awarded four new contracts worth US$17 million for its traffic control and toll technology in Mexico. The technology will be implemented on the Paquete Michoacán motorways, the Poetas fast lane, the Celaya ring road motorway and the Necaxa Tihuatlan tunnels. Intelligent traffic systems (ITS) and toll systems will be deployed on the Celaya ring road motorway, including a control centre to integrate the various ITS and surveillance sub-systems via closed circ
  • Varying acceptance of tolling in Africa
    January 6, 2016
    Tolling technology is now at an advanced state but governments have a key role in ensuring the success of schemes as is evident in Africa. Shem Oirere reports. According to the African Development Bank, the continent has an estimated $46bn of infrastructure financing deficit. The bank says sub-Saharan Africa requires $93bn annually to meet its infrastructure development needs - but only half of the financing is available.