Skip to main content

McCann participates in M1 smart motorway scheme

Civil and electrical engineering firm McCann will help upgrade a 7.5 mile stretch of a major Midlands route as part of the M1 junction 23a – 25 smart motorway scheme. The project stems from an agreement with Highways England and is intended to reduce congestion and smooth the flow of traffic to improve travel times. Carl Lancaster, operations director for McCann, says: “The finished project will also help to minimise environmental impacts and maximise the capacity of the motorway while ensuring continued
July 16, 2018 Read time: 2 mins
Civil and electrical engineering firm McCann will help upgrade a 7.5 mile stretch of a major Midlands route as part of the M1 junction 23a – 25 smart motorway scheme. The project stems from an agreement with 8101 Highways England and is intended to reduce congestion and smooth the flow of traffic to improve travel times.


Carl Lancaster, operations director for McCann, says: “The finished project will also help to minimise environmental impacts and maximise the capacity of the motorway while ensuring continued driver safety.”

McCann will install 500 lighting columns, 100,000m of lighting cable, 12,000m of lighting duct infrastructure, 40,000m of communication cable and 230 communication cabinets. The company will also install relevant technology to 27 new gantries as well as 13 existing gantries.

The project includes the conversion of the hard shoulder to create a fourth lane between junctions 24 and 25 as well as alterations to accommodate the new lane. Variable speed limits and associated smart motorway systems, CCTV systems and electronic signage, a hardened central reservation and a queue detection system to control congestion will also be implemented.  

McCann will work alongside technology construction companies 2002 Costain and Galliford Try. The project is scheduled to be completed in late 2018.

UTC

Related Content

  • March 17, 2017
    Major Midlands junction improvement open
    Highways England’s US$236 million (£191 million) scheme to improve journeys for drivers using a major interchange on the M1 in the Midlands has been officially opened. The major upgrade to improve the flow of traffic at junction 19, where the M1, M6 and A14 meet, is intended to the journeys made by more than 150,000 vehicles through the area every day. The new east-west link between the villages of Catthorpe and Swinford now runs beneath the M1-M6 link, and the M6, and connects the villages with the A
  • December 5, 2014
    Motorists want roads repaired before smart motorways, says survey
    According to research by Bury-based online car supermarket JamJar Direct, which indicates that 47 per cent of Greater Manchester motorists claim to have been affected by the construction works, communications around the M60 smart motorway improvements are sorely lacking. Almost two thirds of Greater Manchester motorists (62 per cent) are aware that the M60 is being turned into a smart motorway, but over 40 per cent, equivalent to 81,000 vehicles per day using affected stretch of M60 between junctions 8 a
  • July 15, 2016
    New Zealand’s smart motorway opens
    Commuters heading north on Wellington’s urban motorway will now get a smoother trip as the new lane is fully opened and New Zealand’s first smart motorway is turned on in the northbound direction. Using variable speed limits, which will be adjusted in real time in response to changing traffic conditions, the smart motorway will pace vehicles to smooth the traffic flow. Officials say this will result in safer journeys with more predictable travel times. It will also free up nearby roads for better public
  • August 21, 2017
    New Hampshire plans for tomorrow’s communication
    Someone once likened predicting the future to ‘nailing a jelly to the wall’. With ITS, C-ITS and V2X technology progressing at such a pace, predicting the future is more akin to trying to nail three jellies to the wall – but only having one nail. And yet with roadways having a lifetime measured in decades, that is exactly what highway engineers and traffic planners are expected to do. Fortunately, New Hampshire DoT (NHDoT) believes its technological advances may be able to provide a solution. The Central Ne