Skip to main content

Mayor sets out transport plan for London

Transport plans have been set out by London Mayor Boris Johnson. Crossrail 2 is at the centre of the plans, providing a link between north and south London. To prevent London falling behind other cities, it is vital that work begin in 2019 on the US$18.77 billion project. Johnson claims growth in London is a key driver of the UK economy and has called for a stable and long-term funding settlement. Johnson will commission a study into funding his infrastructure plans.
June 12, 2013 Read time: 1 min
Transport plans have been set out by London Mayor Boris Johnson. Crossrail 2 is at the centre of the plans, providing a link between north and south London. To prevent London falling behind other cities, it is vital that work begin in 2019 on the US$18.77 billion project. Johnson claims growth in London is a key driver of the UK economy and has called for a stable and long-term funding settlement.  Johnson will commission a study into funding his infrastructure plans.

He also supports an upgrade of the London Underground, an extension of his bike scheme, a new Thames Estuary airport and plans for 2,000 new buses. New proposals include replacing the Hammersmith flyover with a tunnel and extending the Bakerloo line to Camberwell and Peckham.

Related Content

  • Key Russian PPP project
    April 18, 2012
    The Northern Capital Highway (NCH) consortium has been named the preferred bidder in the tender for the central section of St Petersburg’s Western High-Speed Diameter (WHSD) project. Should NCH win the tender process it will build and then operate the entire stretch of the toll road. The consortium comprises VTB Capital and Gazprombank from Russia in partnership with Italian company Astaldi and Turkish firm Ictas Insaat.
  • Bogota's metro tender delayed
    July 25, 2014
    The tender for Bogota, Colombia’s decades-long and much-delayed first metro line has been pushed to the first quarter of 2015 following expansion of the US$3.6 billion project. The original project included the construction of the first line of Bogota’s 26.5 kilometre long metro, which would have 28 stations and be used by around 600,000 people a day. This is the first of four lines planned to be built in the next 30 years. The metro will complement the existing urban transport system by handling 50 p
  • Tolling agencies build resilience into highway operations
    August 6, 2013
    IBTTA executive director and CEO Patrick D. Jones looks at tolling’s resilience in an increasingly unpredictable and cash-strapped world. Turbulent times call for transportation agencies to move smarter. That’s why resilience and preparedness have become watchwords in every aspect of tollway operations. From having the financial resources to invest in construction, maintenance and roadway operations, to having up-to-date emergency plans and social media strategies to cope with severe weather, tolling agenci
  • CoMotion LA Live 2020: report
    November 30, 2020
    November’s CoMotion LA Live event looked at new technology, emerging partnerships – and how Joe Biden’s ‘super-commuter’ status might just stand future mobility in good stead