Skip to main content

Manchester’s traffic signal upgrade completed

Siemens has completed a major upgrade of Manchester’s traffic signal system, with the replacement of a total of 52,000 traditional traffic signal bulbs with longer-lasting and energy saving LED lights across more than 1,800 sites, resulting in energy savings of US$1.26 million and maintenance savings in excess of US$505,000. The upgrade programme has reduced monthly energy usage from 1,000,000 KW/hr in March 2012 to 480,000 KW/hr in February 2014. The new traffic signals also benefit the environment thro
April 22, 2014 Read time: 2 mins
189 Siemens has completed a major upgrade of Manchester’s traffic signal system, with the replacement of a total of 52,000 traditional traffic signal bulbs with longer-lasting and energy saving LED lights across more than 1,800 sites, resulting in energy savings of US$1.26 million and maintenance savings in excess of US$505,000.

The upgrade programme has reduced monthly energy usage from 1,000,000 KW/hr in March 2012 to 480,000 KW/hr in February 2014. The new traffic signals also benefit the environment through being a more durable alternative to traditional bulbs, needing to be replaced every seven years on average, saving around 30,000 standard bulbs per year.

Councillor Andrew Fender, chair of the 817 Transport for Greater Manchester (TfGM) Committee, said: ‘This programme is the biggest of its kind in the country and is fantastic news for Greater Manchester. It’s another significant step towards a greener, more energy efficient transport network. The new LED lights come with less maintenance and lower running costs, and the money saved can be invested into other important transport projects and services that will keep Greater Manchester moving in the right direction.’

The traffic signal upgrade programme is part of a 15-year maintenance contract with TfGM and has taken two years to complete.

For more information on companies in this article

Related Content

  • Siemens constructing driverless subway in Riyadh
    October 11, 2013
    A consortium of Siemens, US company Bechtel and local construction companies Almabani and Consolidated Contractors Company has been awarded a subway contract worth US$10 billion by the Riyadh High Commission for Urban Development (ArRiyadh Development Authority). Siemens, whose share of the deal is worth around US$2.1 billion, is supplying subway rolling stock, electrification systems and signalling technology for driverless operation, as well as system integration.
  • Reducing congestion with Tomtom's historical traffic data
    December 5, 2012
    Historical traffic data provided by TomTom is being used by the local government in Spain’s Basque region to reduce road congestion at less cost. Old habits die hard. Photos from as far back as the 1930s show people counting cars by the roadside in order to provide congestion data to those running road networks. Today, such techniques are still used, albeit augmented by a range of automation technologies such as inductive loops, infra-red sensors and number plate recognition. Even with these advances, howe
  • Monitoring during construction reveals benefits of new expressway
    June 6, 2014
    David Crawford reports on how the authorities in New Zealand are using Bluetooth technology to monitor the effects of a new expressway as it is being constructed. New Zealand Highway Agency (NZHA) is using Bluetooth-based vehicle detection to assess the impact of its biggest road building project as the various sections are completed. The large-scale deployment of a Bluetooth-based vehicle detection system is making substantial contributions to traffic data needs in progressing the new Waikato Expressway, a
  • Over 5 million cyclists in four years at Hackney's Goldsmiths Row
    December 7, 2017
    Traffic Technology's (TT’s) iSight-iD cycle count information display has counted more than 5,155,904 cycles since August 2013, and more 1,000,000 cycles since January 2017, at Goldsmiths Row in the London Borough of Hackney. The data collected enables the Council to monitor the growth in cycling and plan future improvements to keep cyclists safe and make cycling more popular. According to the Council, the Borough has the highest cycle to work rate in London and the fourth highest in the UK. The