Skip to main content

Major road projects to improve journeys in Merseyside and Cheshire

Two major new road schemes worth more than US$388 million (£300 million) are set to cut congestion and improve journey times for hundreds of thousands of drivers in Merseyside and Cheshire, UK. Highways England has set out its preferred options for upgrading the key route to the Port of Liverpool and creating a new junction on the M56 near Runcorn following public consultations earlier this year.
September 1, 2017 Read time: 2 mins

 Two major new road schemes worth more than US$388 million (£300 million) are set to cut congestion and improve journey times for hundreds of thousands of drivers in Merseyside and Cheshire, UK.

8101 Highways England has set out its preferred options for upgrading the key route to the Port of Liverpool and creating a new junction on the M56 near Runcorn following public consultations earlier this year.

A new three-mile dual carriageway between the motorway network and the port will take freight away from residential areas on the A5036, which has been identified as being the tenth most congested road in England. The bypass will serve the existing port as well as the deep-water container terminal, which is expected to triple the port’s volume of goods by 2030.

The new junction 11a on the M56 will provide a new link to the Mersey Gateway bridge between Runcorn and Widnes and improve local access to the motorway, while the new junction on the M56 will take traffic away from residential areas as well as providing a new route to the Mersey Gateway bridge – an important new link between Cheshire and Merseyside.

A new roundabout, controlled by traffic lights, will also be built at the junction connecting Broom’s Cross Road, Brickwall Lane and the new bypass. Broom’s Cross Road will also be upgraded to a dual carriageway from the new roundabout to Switch Island, where the A5036 connects with the M57 and M58.

Detailed designs for both major road projects will now be developed, with construction work due to start by spring 2020.

Funding for the schemes is being provided as part of the government’s £15 billion Road Investment Strategy (RIS), and will help boost the Northern Powerhouse by improving transport connectivity and reliability to help the economy of the North.

For more information on companies in this article

Related Content

  • Off road trials for electric highways technology
    August 11, 2015
    Following the completion of the feasibility study commissioned by Highways England into dynamic wireless power transfer technologies, off road trials of the technology needed to power electric and hybrid vehicles on England’s major roads are due to take place later this year. The trials are the first of their kind and will test how the technology would work safely and effectively on the country’s motorways and major A roads, allowing drivers of ultra-low emission vehicles to travel long distances without
  • Diverse development of tolling business models
    April 25, 2013
    A diversity of tolling business models offers a wider toolbox of highway finance options, as the IBTTA’s Patrick Jones explains. The business models for America’s tolled highways have gone through several different evolutions over the last 75 years, reflecting a succession of shifts in transportation policy and politics, financing and funding models, urban patterns, customer needs, and technology. And with more and more decision-makers expressing renewed interest in tolling, it’s that very diversity that ma
  • Lighting upgrade for Mersey tunnel
    November 6, 2014
    Liverpool transport chiefs are planning a two-year US$14.3 million upgrade to lighting in one of the Mersey tunnels. The Kingsway Tunnel is the second longest road tunnel in the UK at a length of 1.6 miles per tube and is a major transport gateway for the Liverpool City Region, with 16 million vehicles passing through the tunnel each year, and is the only tunnel that can accommodate freight vehicles over 3.5Te GVW. The current lighting installation totals 3.2 miles and consists of over 1800 light fitting
  • Twenty year vision for Birmingham city transport
    November 14, 2014
    A white paper setting out Birmingham’s 20-year vision for improving transport across the city is set to be unveiled today. Birmingham Connected aims to make the city safer and easier to travel around by reducing congestion and promoting more sustainable forms of transport. Initiatives in the plan include the completion of a US$1.9 billion public transport network within 20 years and the development of Green Travel Districts to enable people to walk, cycle or take public transport safely. A feasibilit