Skip to main content

Major road projects to improve journeys in Merseyside and Cheshire

Two major new road schemes worth more than US$388 million (£300 million) are set to cut congestion and improve journey times for hundreds of thousands of drivers in Merseyside and Cheshire, UK. Highways England has set out its preferred options for upgrading the key route to the Port of Liverpool and creating a new junction on the M56 near Runcorn following public consultations earlier this year.
September 1, 2017 Read time: 2 mins

 Two major new road schemes worth more than US$388 million (£300 million) are set to cut congestion and improve journey times for hundreds of thousands of drivers in Merseyside and Cheshire, UK.

8101 Highways England has set out its preferred options for upgrading the key route to the Port of Liverpool and creating a new junction on the M56 near Runcorn following public consultations earlier this year.

A new three-mile dual carriageway between the motorway network and the port will take freight away from residential areas on the A5036, which has been identified as being the tenth most congested road in England. The bypass will serve the existing port as well as the deep-water container terminal, which is expected to triple the port’s volume of goods by 2030.

The new junction 11a on the M56 will provide a new link to the Mersey Gateway bridge between Runcorn and Widnes and improve local access to the motorway, while the new junction on the M56 will take traffic away from residential areas as well as providing a new route to the Mersey Gateway bridge – an important new link between Cheshire and Merseyside.

A new roundabout, controlled by traffic lights, will also be built at the junction connecting Broom’s Cross Road, Brickwall Lane and the new bypass. Broom’s Cross Road will also be upgraded to a dual carriageway from the new roundabout to Switch Island, where the A5036 connects with the M57 and M58.

Detailed designs for both major road projects will now be developed, with construction work due to start by spring 2020.

Funding for the schemes is being provided as part of the government’s £15 billion Road Investment Strategy (RIS), and will help boost the Northern Powerhouse by improving transport connectivity and reliability to help the economy of the North.

For more information on companies in this article

Related Content

  • Pilot shows how wi-fi data could improve London Underground journeys
    September 11, 2017
    Journeys on London Underground could be improved through Transport for London (TfL) harnessing wi-fi data to make more information available to customers as they move around London, new research has shown. The four-week TfL pilot, which ran between November and December last year, studied how depersonalised wi-fi connection data from customers' mobile devices could be used to better understand how people navigate the London Underground network, allowing TfL to improve the experience for customers.
  • Norway to build cycle highways
    March 8, 2016
    Norway is proposing to spend US$923 million and build ten dual-lane bicycle pathways that would link the country's nine largest cities and extend to their suburbs, allowing longer-distance cyclists to travel with a speed and safety hitherto impossible. The effort is part of the country's National Transit Plan, which seeks to reduce emissions from vehicular traffic. Challenges, however, include dark winters, steep mountains and the small number of Norwegians who use cycles. According to CityLab, the ef
  • USDoT pilots show win-win potential for connected vehicles
    December 19, 2017
    Pete Goldin discovers the state of play with connected vehicles trials in the US and the impact of Hurricane Irma on Tampa’s pilot. The US Department of Transportation’s (USDoT’s) connected vehicle (CV) pilot sites have moved into phase 2 of the deployment programme– design, build, test and, maybe most importantly, collaborate.
  • New Port Mann Bridge opens to eight lanes of traffic
    December 6, 2012
    Canada’s British Columbia (BC) government is delivering on its commitment to reduce congestion along the province’s busiest transportation corridor, with the opening of the new Port Mann Bridge to eight lanes of traffic, which cuts commute times and allows for the first regular transit service across the bridge in twenty-five years. This is the largest transportation project in BC history and completes the first and largest phase of the Port Mann/Highway 1 Improvement Project, which includes highway widenin