Skip to main content

Major Midlands junction improvement open

Highways England’s US$236 million (£191 million) scheme to improve journeys for drivers using a major interchange on the M1 in the Midlands has been officially opened. The major upgrade to improve the flow of traffic at junction 19, where the M1, M6 and A14 meet, is intended to the journeys made by more than 150,000 vehicles through the area every day. The new east-west link between the villages of Catthorpe and Swinford now runs beneath the M1-M6 link, and the M6, and connects the villages with the A
March 17, 2017 Read time: 2 mins
8101 Highways England’s US$236 million (£191 million) scheme to improve journeys for drivers using a major interchange on the M1 in the Midlands has been officially opened.

The major upgrade to improve the flow of traffic at junction 19, where the M1, M6 and A14 meet, is intended to the journeys made by more than 150,000 vehicles through the area every day.

The new east-west link between the villages of Catthorpe and Swinford now runs beneath the M1-M6 link, and the M6, and connects the villages with the A5.

And for the first time in over 20 years local traffic, pedestrians, cyclists and horse riders are separated from long-distance traffic, particularly HGVs.

Highways England has also created a new public right of way/bridleway between Swinford and Catthorpe, a footway alongside the new local road between Swinford and Catthorpe and a new footpath to the north of the A14, as well as areas for wildlife and trees.

Elsewhere in the Midlands, Highways England’s US$131 million (£106 million) improvement scheme at Tollbar End in Coventry has also officially opened.

Related Content

  • December 18, 2014
    Queensland extends emergency vehcile priority system
    Following encouraging results from an initial small-scale trial of an emergency vehicle priority system in Queensland, Australia, the scheme is now being extended. In an emergency every second counts. Nowhere is this more graphically illustrated than by the survivability statistics for the time to cardiopulmonary resuscitation of pre-hospital cardiac arrest: at four minutes the survival rate is 22% but by 14 minutes the survival has dropped to 5% - as can be seen from the graph below. There is a similar tre
  • March 30, 2017
    New user research: What makes a successful road journey?
    Drivers say journey time is the most important factor to measure on England’s motorways and major ‘A’ roads, according to research published by Transport Focus, the transport user watchdog and the Office of Rail and Road (ORR), the monitor of Highways England. The research, Measuring performance of England’s strategic roads: what users want, includes the views of drivers, cyclists, pedestrians and freight companies. Drivers are most concerned with issues relating to journey time, which includes how
  • August 23, 2023
    The inside story of how traffic chaos was avoided after I-95 collapse
    June’s collapse of major US roadway I-95 in Pennsylvania could have caused lengthy traffic chaos. But - relatively speaking at least - it didn’t and gridlock was avoided. Alan Dron finds out why
  • May 27, 2020
    WJ Group marks out new territory
    Company gears up to demarcate pop-up cycle and walking routes in England