Skip to main content

Low power retrofit LED wait indicators from Siemens

Siemens’ new energy saving LED pedestrian crossing wait indicator retrofit solution allows both Siemens and Peek 48 volt incandescent wait indicators to be upgraded to the latest Central Light Source (CLS) LED technology, says the company. Siemens claim the low power consumption the solution offers power savings typically in excess of 70% and represents a highly cost effective upgrade option for existing wait indicators, particularly when undertaken alongside a wider LED traffic signal upgrade program. The
January 7, 2013 Read time: 2 mins
189 Siemens’ new energy saving LED pedestrian crossing wait indicator retrofit solution allows both Siemens and Peek 48 volt incandescent wait indicators to be upgraded to the latest Central Light Source (CLS) LED technology, says the company.

Siemens claim the low power consumption the solution offers power savings typically in excess of 70% and represents a highly cost effective upgrade option for existing wait indicators, particularly when undertaken alongside a wider LED traffic signal upgrade program.

The new solution uses yellow LEDs to provide improved visibility, particularly in bright sunlight, providing excellent optical performance, combined with easy installation and a full lamp monitoring compatibility with Siemens controllers

According to head of product management, Keith Manston, Siemens’ customers are looking at every opportunity to reduce power consumption and this latest addition to the Siemens low-power LED retrofit portfolio provides a sustainable solution with minimum waste, high optical brightness and outstanding phantom performance.

Siemens says the new wait indicators complement the existing Siemens retrofit solution for Helios and Peek Elite signals, now allowing all signalling equipment on a site to be efficiently upgraded to modern LED technology, re-using as much of the existing roadside equipment as possible.

This latest development not only enables customers to benefit from the overall energy savings of low power LED solutions, it eliminates the ongoing need to regularly replace lamps, reducing the carbon footprint in both the lamp manufacturing process and the vehicle miles travelled to the site to undertake lamp changes.
UTC

Related Content

  • July 3, 2017
    ChargePoint secures additional funding led by Siemens
    Electric vehicle (EV) charging network supplier ChargePoint has secured an additional US$43 million in funding, led by Siemens, closing the US company’s latest funding round at US$125 million. The company had earlier secured US$82 million in its Series G round of US$82 million, led by Daimler.
  • January 18, 2012
    Inertial sensors dramatically improve GNSS for ITS applications
    Phil Harris, Thales UK, on how fused sensor data can significantly enhance GNSS-based positioning systems' performance in urban areas. Global Navigation Satellite System (GNSS)-based positioning is unique among available positioning technology due to its universal coverage and low equipment cost. By measuring the distances between an unknown position (such as a vehicle), and at least three known positions (GPS satellites), the unknown position can be calculated in three dimensions (latitude, longitude, and
  • April 26, 2013
    ITS asset management matters
    Maintenance of on-road ITS kit needs to become more sophisticated; while new technologies can deliver better road maintenance. David Crawford investigates both sides of the issue "Good information is key to effective ITS asset maintenance,” says Ian Routledge of the Ian Routledge Consultancy (IRC), whose Imtrac (Information Management for TRAffic Control) system is poised for European expansion. Developed as an ‘intelligent filing cabinet’ for storing information about on-road equipment, the online database
  • April 8, 2014
    Opening the closed-loop to realise ITS benefits
    Jim Leslie, manager of ITS applications engineering at the Econolite Group looks at practical steps in transitioning from closed-loop masters to a centralised ATMS. Not many years ago the standard method of coordinating signalised intersections in local areas was to install an on-street master – each of which monitored and controlled a limited number of signal controllers or intersections as a closed-loop system. And, to a certain extent, each closed-loop system was autonomous from others deployed by the ag