Skip to main content

Louis Berger awarded Mumbai Metro Line four contract

The Mumbai Metropolitan Region Development Authority (MMRDA) has awarded Louis Berger the project management and construction management contract to work alongside a consortium for the city’s Metro Line 4. Once completed, the service is expected to reduce travel times between Wadala and Kasarvadavali by up to 75%. Line 4, expected to cost ₹15,549 crore ($1.59bn), will be a 32.3-kilometer long elevated corridor with 32 stations. The route will offer interconnectivity between the eastern expressway, central
April 12, 2018 Read time: 2 mins

The Mumbai Metropolitan Region Development Authority (MMRDA) has awarded 4736 Louis Berger the project management and construction management contract to work alongside a consortium for the city’s Metro Line 4. Once completed, the service is expected to reduce travel times between Wadala and Kasarvadavali by up to 75%.

Line 4, expected to cost ₹15,549 crore ($1.59bn), will be a 32.3-kilometer long elevated corridor with 32 stations. The route will offer interconnectivity between the eastern expressway, central railway and Mumbai’s Monorail as well as providing links to proposed metro lines 2B, 5, 6 and 8.

The consortium also comprises DB Engineering and Hill International. Louis Berger will prepare, package and finalise tender documents for system contracts. The project’s scope also includes verification and approval of all civil and system contract design submissions, rolling stock, supervision of all construction activities, certification of vendor sources and inspection of vendor products and services.

Kshitish Nadgauda, Louis Berger’s senior vice president and managing director for Asia, said: “This metro line is a welcome addition for the people of Mumbai. It will help alleviate traffic congestion and provide better connectivity between central Mumbai and the Thane district.”

For more information on companies in this article

Related Content

  • To charge or not to charge, that is the question
    January 26, 2018
    Alan Dron looks at why congestion charging and other similar schemes are so controversial in North America. In August, Andrew Cuomo, governor of New York State, described congestion charging for the city as “an idea whose time had come,” according to the Bloomberg wire service. In October, he announced a ‘Fix NYC’ advisory panel to study methods of easing congestion on the city’s streets. Although Cuomo did not specifically mention congestion charging when setting up the panel, he said it would study
  • OCTA seeks proposals from three teams for I-405 freeway project
    March 31, 2016
    The Orange County Transportation Authority, California, is seeking proposals from a shortlist of firms for the design and construction of the I-405 Improvement Project, an important step toward building a better freeway that is intended to improve travel times for those driving the corridor between Costa Mesa and the Los Angeles County line. The OCTA Board of Directors has unanimously approved the criteria for selecting a firm to design and build the freeway improvements and approved issuing the final re
  • Wireless technology aids city-wide traffic management
    October 10, 2012
    An extensive hybrid communications network in the County of Los Angeles is proving the capability and benefits of modern wireless technology for traffic management across wide areas. Wireless communications technology has found a welcoming test bed for use in traffic management systems, in the County of Los Angeles. The county has long running programmes synchronizing and monitoring traffic signals over large areas. In the process, combined with installation of advanced traffic management systems (ATMS), th
  • Santa Cruz loses contact with Masabi
    November 13, 2020
    Mobile ticketing application is expected to improve passenger safety