Skip to main content

Louis Berger awarded Mumbai Metro Line four contract

The Mumbai Metropolitan Region Development Authority (MMRDA) has awarded Louis Berger the project management and construction management contract to work alongside a consortium for the city’s Metro Line 4. Once completed, the service is expected to reduce travel times between Wadala and Kasarvadavali by up to 75%. Line 4, expected to cost ₹15,549 crore ($1.59bn), will be a 32.3-kilometer long elevated corridor with 32 stations. The route will offer interconnectivity between the eastern expressway, central
April 12, 2018 Read time: 2 mins

The Mumbai Metropolitan Region Development Authority (MMRDA) has awarded 4736 Louis Berger the project management and construction management contract to work alongside a consortium for the city’s Metro Line 4. Once completed, the service is expected to reduce travel times between Wadala and Kasarvadavali by up to 75%.

Line 4, expected to cost ₹15,549 crore ($1.59bn), will be a 32.3-kilometer long elevated corridor with 32 stations. The route will offer interconnectivity between the eastern expressway, central railway and Mumbai’s Monorail as well as providing links to proposed metro lines 2B, 5, 6 and 8.

The consortium also comprises DB Engineering and Hill International. Louis Berger will prepare, package and finalise tender documents for system contracts. The project’s scope also includes verification and approval of all civil and system contract design submissions, rolling stock, supervision of all construction activities, certification of vendor sources and inspection of vendor products and services.

Kshitish Nadgauda, Louis Berger’s senior vice president and managing director for Asia, said: “This metro line is a welcome addition for the people of Mumbai. It will help alleviate traffic congestion and provide better connectivity between central Mumbai and the Thane district.”

For more information on companies in this article

Related Content

  • GMV renews video surveillance system on Barcelona’s metro network
    April 12, 2018
    Barcelona Metropolitan Transport (TMB) has selected GMV to upgrade the on-board video surveillance system on 149 metro trains to improve communication across the city’s metro network. The uniform video-surveillance system will run on lines L1-L5 and L11 of the city’s metro network. For the project, 300 video recorders will be supplied along with 300 communication nodes, 600 antennae, 760 video coders, 740 Ethernet switches and 540 IP cameras. The system will also be integrated with existing CCTV system
  • IBTTA elects Fremier as vice president
    March 8, 2021
    Bay Area Toll Authority's Andrew Fremier to take up 2021 leadership role at IBTTA
  • Connected vehicle trials get big backing from USDOT
    March 14, 2016
    Connected vehicle technology will emerge as a sustainable reality at three sites in the US over the next four years. Jon Masters reports. Advocates of connected vehicle (CV) technology have received a welcome boost from news that the US government has committed a further $4 billion towards automated vehicle research and CV technology. This comes hot on the heels of the US Department of Transportation’s $42 million CV pilot pledge in October last year.
  • IRD wins three tolling contracts in India
    February 3, 2012
    IRDSA (IRD South Asia), the wholly-owned subsidiary of International Road Dynamics (IRD) has signed three tolling contracts in India with a total value of over US$1.5 million.