Skip to main content

Louis Berger awarded Mumbai Metro Line four contract

The Mumbai Metropolitan Region Development Authority (MMRDA) has awarded Louis Berger the project management and construction management contract to work alongside a consortium for the city’s Metro Line 4. Once completed, the service is expected to reduce travel times between Wadala and Kasarvadavali by up to 75%. Line 4, expected to cost ₹15,549 crore ($1.59bn), will be a 32.3-kilometer long elevated corridor with 32 stations. The route will offer interconnectivity between the eastern expressway, central
April 12, 2018 Read time: 2 mins

The Mumbai Metropolitan Region Development Authority (MMRDA) has awarded 4736 Louis Berger the project management and construction management contract to work alongside a consortium for the city’s Metro Line 4. Once completed, the service is expected to reduce travel times between Wadala and Kasarvadavali by up to 75%.

Line 4, expected to cost ₹15,549 crore ($1.59bn), will be a 32.3-kilometer long elevated corridor with 32 stations. The route will offer interconnectivity between the eastern expressway, central railway and Mumbai’s Monorail as well as providing links to proposed metro lines 2B, 5, 6 and 8.

The consortium also comprises DB Engineering and Hill International. Louis Berger will prepare, package and finalise tender documents for system contracts. The project’s scope also includes verification and approval of all civil and system contract design submissions, rolling stock, supervision of all construction activities, certification of vendor sources and inspection of vendor products and services.

Kshitish Nadgauda, Louis Berger’s senior vice president and managing director for Asia, said: “This metro line is a welcome addition for the people of Mumbai. It will help alleviate traffic congestion and provide better connectivity between central Mumbai and the Thane district.”

For more information on companies in this article

Related Content

  • New York transit joins Paris greenhouse gas initiative
    November 13, 2019
    New York’s Metropolitan Transportation Authority (MTA) has joined the Science Based Targets Initiative (SBTi) to reduce its greenhouse gas emissions in line with the Paris Climate Agreement. The Paris document seeks to keep a global temperature rise this century below 2 degrees Celsius above pre-industrial level and to limit temperature increase to 1.5 degrees Celsius. The SBTi is a joint partnership between United Nations Global Compact, the World Resources Institute, World Wildlife Fund and non-profit
  • Ohio River Bridges East End crossing project opened to traffic
    December 21, 2016
    The Ohio River Bridges East End Crossing, now named the Lewis and Clark Bridge, has opened to traffic to connect SR 265 in Indiana with the Gene Snyder Freeway in Kentucky, marking the substantial completion of the $2.3 billion Louisville Southern Indiana Ohio River Bridges project, which included the Downtown Crossing, now named the Abraham Lincoln Bridge. Parsons was the lead partner in the Community Transportation Solutions joint venture (JV). The JV served as the overall project’s general engineerin
  • Solving Detroit’s jams: just ask a Michigan student
    October 17, 2019
    At the Institute of Transportation Engineers annual meeting, a clever student plan to reduce commute times in Detroit suggests the future of the ITS industry is in good hands, write Pete Spiller and Jarrod Cady A team of students from the University of Michigan won a national student Transportation Technology Tournament - sponsored by the National Operations Center of Excellence (NOCoE) and the US Department of Transportation - with a compelling presentation on reducing congestion. In an impressive d
  • Meeting the challenges of smartcard fare payment
    July 4, 2012
    David Crawford monitors a growing trend in contactless smartcard ticketing The north east United States has become a hive of activity in the smart fare payment arena. In October 2011, the New York Metropolitan Transportation Authority (MTA) published, as a preliminary to an imminent procurement process, the detailed concept of its New Fare Payment System (NFPS). Based on open payment industry standards, this is designed to be implemented on all MTA bus and subway services operated by New York City Transit (