Skip to main content

Louis Berger awarded Mumbai Metro Line four contract

The Mumbai Metropolitan Region Development Authority (MMRDA) has awarded Louis Berger the project management and construction management contract to work alongside a consortium for the city’s Metro Line 4. Once completed, the service is expected to reduce travel times between Wadala and Kasarvadavali by up to 75%. Line 4, expected to cost ₹15,549 crore ($1.59bn), will be a 32.3-kilometer long elevated corridor with 32 stations. The route will offer interconnectivity between the eastern expressway, central
April 12, 2018 Read time: 2 mins

The Mumbai Metropolitan Region Development Authority (MMRDA) has awarded 4736 Louis Berger the project management and construction management contract to work alongside a consortium for the city’s Metro Line 4. Once completed, the service is expected to reduce travel times between Wadala and Kasarvadavali by up to 75%.

Line 4, expected to cost ₹15,549 crore ($1.59bn), will be a 32.3-kilometer long elevated corridor with 32 stations. The route will offer interconnectivity between the eastern expressway, central railway and Mumbai’s Monorail as well as providing links to proposed metro lines 2B, 5, 6 and 8.

The consortium also comprises DB Engineering and Hill International. Louis Berger will prepare, package and finalise tender documents for system contracts. The project’s scope also includes verification and approval of all civil and system contract design submissions, rolling stock, supervision of all construction activities, certification of vendor sources and inspection of vendor products and services.

Kshitish Nadgauda, Louis Berger’s senior vice president and managing director for Asia, said: “This metro line is a welcome addition for the people of Mumbai. It will help alleviate traffic congestion and provide better connectivity between central Mumbai and the Thane district.”

For more information on companies in this article

Related Content

  • Metron consortium wins Sydney Metro design contract
    May 3, 2017
    Metron, a consortium of Arcadis, Mott MacDonald, architecture house Foster + Partners, local architect Architectus and Robert Bird Group, has been awarded the underground station design and technical services contract as part of Stage 2 of the Sydney Metro project. With 31 stations and 66km of new metro rail, Sydney Metro is Australia's biggest public transport project. Stage 2 will include a 30 kilometre extension of metro rail under Sydney Harbour and through new CBD stations. Metron will lead the enginee
  • Traffic to flow freely over world’s widest bridge
    November 13, 2012
    Pete Goldin reports on a new Egis project in Canada, providing open road tolling operations for the widest bridge in the world. A bridge can present a bottleneck in a system of roads or it can support the smooth and unobstructed flow of traffic. Much depends on the bridge design, surrounding infrastructure and tolling system. By adding lanes and deploying open road tolling (ORT), the new Port Mann Bridge located in the metropolitan Vancouver area in British Columbia, will alleviate congestion at one of the
  • Michael Baker International to aid SEPTA’s ‘Rebuilding the System’ program
    August 17, 2016
    As part of its Rebuilding the System Program, the South Eastern Pennsylvania Transportation Authority (SEPTA) in the US has awarded Michael Baker International a three-year, US$8-million contract to provide general engineering, construction management and inspection services to a range of SEPTA projects throughout south-eastern Pennsylvania. As part of the contract, the Michael Baker team will support SEPTA in their management of complex construction projects with the goal of ensuring quality, enhanci
  • Egis Projects-Sanef consortium sign second major ORT operations contract in Canada
    April 2, 2012
    A consortium composed of Egis Projects and Sanef has signed a contract for the operation of the Port Mann Bridge open road tolling (ORT) project in the Metro Vancouver Area, Canada. The largest transportation infrastructure project in British Columbia history, it includes doubling the capacity of the bridge and widening the highway from Vancouver to Langley, a distance of 37 kilometres. Once complete, it will reduce travel times by up to 30 per cent, and save drivers up to an hour a day. The new bridge will