Skip to main content

Louis Berger awarded Mumbai Metro Line four contract

The Mumbai Metropolitan Region Development Authority (MMRDA) has awarded Louis Berger the project management and construction management contract to work alongside a consortium for the city’s Metro Line 4. Once completed, the service is expected to reduce travel times between Wadala and Kasarvadavali by up to 75%. Line 4, expected to cost ₹15,549 crore ($1.59bn), will be a 32.3-kilometer long elevated corridor with 32 stations. The route will offer interconnectivity between the eastern expressway, central
April 12, 2018 Read time: 2 mins

The Mumbai Metropolitan Region Development Authority (MMRDA) has awarded 4736 Louis Berger the project management and construction management contract to work alongside a consortium for the city’s Metro Line 4. Once completed, the service is expected to reduce travel times between Wadala and Kasarvadavali by up to 75%.

Line 4, expected to cost ₹15,549 crore ($1.59bn), will be a 32.3-kilometer long elevated corridor with 32 stations. The route will offer interconnectivity between the eastern expressway, central railway and Mumbai’s Monorail as well as providing links to proposed metro lines 2B, 5, 6 and 8.

The consortium also comprises DB Engineering and Hill International. Louis Berger will prepare, package and finalise tender documents for system contracts. The project’s scope also includes verification and approval of all civil and system contract design submissions, rolling stock, supervision of all construction activities, certification of vendor sources and inspection of vendor products and services.

Kshitish Nadgauda, Louis Berger’s senior vice president and managing director for Asia, said: “This metro line is a welcome addition for the people of Mumbai. It will help alleviate traffic congestion and provide better connectivity between central Mumbai and the Thane district.”

For more information on companies in this article

Related Content

  • TransCore to upgrade over 300 toll lanes in central Florida
    October 14, 2015
    The Central Florida Expressway Authority (CFX) has awarded TransCore a US$85 million project to design, install and maintain a new, innovative electronic toll collection system for over 300 toll lanes, as part of an ongoing initiative to improve its transportation management system. TransCore will upgrade the system with its Infinity Digital Lane System, which consists of independent modules that can be easily replaced, upgraded or removed in the field without affecting lane operations, reducing long-ter
  • Indra to implement control centre for Kuala Lumpur LRT and monorail
    July 9, 2013
    Malaysia’s Syarikat Prasarana Negara Berhad (Prasarana), which is responsible for the modernisation of the public transport system in the country, has awarded Indra the contract to design, develop and commission a new integrated control centre for Kuala Lumpur’s monorail and the Ampang and Kelana Jaya light rail transit lines. A new control centre will integrate existing ticketing and passenger information systems, together with all transport lines operated by Prasarana and the mass rapid transit (MRT), the
  • Brazil tenders interstate bus concession in Goiás
    April 10, 2014
    Brazil's national ground transport agency ANTT has launched a four-lot tender budgeted at US$2.55 billion to operate an interstate bus system in and around the nation's capital for 15 years. The public-private partnership involves interconnecting eleven municipalities in the mid-western state of Goiás to several of the federal district's administrative regions. The entire network is comprised of 551 bus lines in 33 sectors that transport some 90 million passengers per year, ANTT says. The tender stip
  • Strabag consortium awarded Eisack River undercrossing contract
    October 24, 2014
    Construction group Strabag, in a consortium with the Italian construction companies Salini Impregilo, Consorzio Cooperative Costruzioni and Collini Lavori, has been awarded a US$379.5 million contract to build the Eisack Undercrossing section of the Brenner Base Tunnel. Work is scheduled to begin this year with a planned construction time of around eight years. The contract section is located at the southern end of the Brenner Base Tunnel near the town of Franzensfeste (Fortezza) in the Province of Bozen