Skip to main content

Louis Berger awarded Mumbai Metro Line four contract

The Mumbai Metropolitan Region Development Authority (MMRDA) has awarded Louis Berger the project management and construction management contract to work alongside a consortium for the city’s Metro Line 4. Once completed, the service is expected to reduce travel times between Wadala and Kasarvadavali by up to 75%. Line 4, expected to cost ₹15,549 crore ($1.59bn), will be a 32.3-kilometer long elevated corridor with 32 stations. The route will offer interconnectivity between the eastern expressway, central
April 12, 2018 Read time: 2 mins

The Mumbai Metropolitan Region Development Authority (MMRDA) has awarded 4736 Louis Berger the project management and construction management contract to work alongside a consortium for the city’s Metro Line 4. Once completed, the service is expected to reduce travel times between Wadala and Kasarvadavali by up to 75%.

Line 4, expected to cost ₹15,549 crore ($1.59bn), will be a 32.3-kilometer long elevated corridor with 32 stations. The route will offer interconnectivity between the eastern expressway, central railway and Mumbai’s Monorail as well as providing links to proposed metro lines 2B, 5, 6 and 8.

The consortium also comprises DB Engineering and Hill International. Louis Berger will prepare, package and finalise tender documents for system contracts. The project’s scope also includes verification and approval of all civil and system contract design submissions, rolling stock, supervision of all construction activities, certification of vendor sources and inspection of vendor products and services.

Kshitish Nadgauda, Louis Berger’s senior vice president and managing director for Asia, said: “This metro line is a welcome addition for the people of Mumbai. It will help alleviate traffic congestion and provide better connectivity between central Mumbai and the Thane district.”

For more information on companies in this article

Related Content

  • South Africa's first multi-lane free-flow tolling top of the line
    February 3, 2012
    Kapsch's Kjell Arnesson talks about the first multi-lane free-flow tolling project in South Africa. In South Africa, installation is ongoing as part of the Gauteng Freeway Improvement Project (GFIP) of the country's first Multi-Lane Free-Flow (MLFF) tolling system.
  • Thales joins Cairo metro pyramid scheme
    July 6, 2022
    Company will provide communications and ticketing for line connecting Giza with Cairo
  • Siemens to electrify Hawaii's first rail transit system
    August 2, 2012
    Siemens Infrastructure & Cities will handle the electrification of Hawaii's first rail transit system which is scheduled for completion by 2019. The new line will run alongside Honolulu's 32-kilometer main arterial road from the East Kapolei district via Pearl Harbor and the airport to the Ala Moana district in the west.
  • Mumbai metro line 1 celebrates first anniversary
    June 10, 2015
    A joint venture between RATP Dev and Transdev, the Mumbai metro line 1 started service on 8 June 2014 and is about to celebrate its first anniversary by crossing the 100 million passenger mark. The 12 kilometre line, with 12 stations and built on a viaduct, is the first in the city, the fifth most populated city in the world with a population of 22 million. The line connects the city’s eastern and western suburbs and has radically changed the daily life of people who previously depended on a bus net