Skip to main content

Louis Berger awarded Mumbai Metro Line four contract

The Mumbai Metropolitan Region Development Authority (MMRDA) has awarded Louis Berger the project management and construction management contract to work alongside a consortium for the city’s Metro Line 4. Once completed, the service is expected to reduce travel times between Wadala and Kasarvadavali by up to 75%. Line 4, expected to cost ₹15,549 crore ($1.59bn), will be a 32.3-kilometer long elevated corridor with 32 stations. The route will offer interconnectivity between the eastern expressway, central
April 12, 2018 Read time: 2 mins

The Mumbai Metropolitan Region Development Authority (MMRDA) has awarded 4736 Louis Berger the project management and construction management contract to work alongside a consortium for the city’s Metro Line 4. Once completed, the service is expected to reduce travel times between Wadala and Kasarvadavali by up to 75%.

Line 4, expected to cost ₹15,549 crore ($1.59bn), will be a 32.3-kilometer long elevated corridor with 32 stations. The route will offer interconnectivity between the eastern expressway, central railway and Mumbai’s Monorail as well as providing links to proposed metro lines 2B, 5, 6 and 8.

The consortium also comprises DB Engineering and Hill International. Louis Berger will prepare, package and finalise tender documents for system contracts. The project’s scope also includes verification and approval of all civil and system contract design submissions, rolling stock, supervision of all construction activities, certification of vendor sources and inspection of vendor products and services.

Kshitish Nadgauda, Louis Berger’s senior vice president and managing director for Asia, said: “This metro line is a welcome addition for the people of Mumbai. It will help alleviate traffic congestion and provide better connectivity between central Mumbai and the Thane district.”

For more information on companies in this article

Related Content

  • Switching Atlanta onto MaaS
    May 9, 2019
    It’s easy to talk about MaaS in the abstract – but MaaS isn’t going to work if it’s just a theory. Colin Sowman speaks to one woman about the practical benefits - and difficulties - of getting out of her car and switching to public transit in Atlanta, Georgia One of the first goals of Mobility as a Service (MaaS) inventor Sampo Hietanen is that MaaS should persuade households they don’t need a second car. This is starting to happen - even in the car-dominated US. Last year, authorities in the state of Ge
  • Georgia Tolls contracts awarded
    December 20, 2013
    Georgia Tolls has awarded contracts for their second and third toll express lanes project on I-75 south and I-75/575 northwest. With national interoperability planned they require the toll systems supplier to install multi-protocol readers on the toll gantries to E-ZPass transponders as well as 6C sticker tags. Toll system integrator will be 3M who is to provide the toll system including vehicle detection, tracking and classification loops, 3-protocol RF readers, license plate imaging cameras and illumin
  • Urban.Mass to roll out autonomous pods 
    October 21, 2021
    Pods can “flock” together into connected trains or run individually 
  • Inrix expands traffic data programme collaboration
    October 12, 2012
    Nearly a year after the I-95 Corridor Coalition, the University of Maryland (UMD) and Inrix announced a three-year expansion of the Vehicle Probe Project (VPP), the coalition and its partners are expanding their collaboration once again. Through a Federal Highway Administration (FHWA) Awards Grant, the coalition will use Inrix traffic information to expand coverage to over 40,000 miles of roads across fourteen states.