Skip to main content

Los Angeles highway closure fears prove groundless

Fears that the closure of a heavily congested stretch of highway in the US city of Los Angeles would lead to massive gridlock over the weekend proved groundless. The demolition of the Mulholland Overpass crossing above I-405 required a 53 hour closure of the busy highway along a 16km stretch. The highway carries amongst the heaviest traffic volumes of any stretch of road in the US and there has been concern that the necessary closure would cause chaos on the city as the inhabitants rely heavily on passenger
April 19, 2012 Read time: 2 mins
Fears that the closure of a heavily congested stretch of highway in the US city of Los Angeles would lead to massive gridlock over the weekend proved groundless. The demolition of the Mulholland Overpass crossing above I-405 required a 53 hour closure of the busy highway along a 16km stretch. The highway carries amongst the heaviest traffic volumes of any stretch of road in the US and there has been concern that the necessary closure would cause chaos on the city as the inhabitants rely heavily on passenger cars for transport.

However many people simply stayed at home and did not drive, avoiding the problem entirely. The city authorities had been warning citizens for some time prior to the highway closure of the need for the demolition work.

In one rather bizarre challenge, a group of cyclists beat a passenger jet making special short distance flights during the closure. The jet flew from Burbank airport to Long Beach airport, a distance of some 48km. Although the flight itself took just 12 minutes, the cyclists were allowed to set off one hour before the aircraft departed so as to account for the travelling to the airport and necessary checking-in time of the passengers. The cyclists completed the distance in one hour 24 minutes, less than half the time required to make journey by cab and aeroplane.

Related Content

  • October 14, 2015
    FTA calls for greater reliability on road network following improvements at Dartford
    Drivers using the Dartford Crossing at peak times are saving around an hour and a half every week thanks to Dart Charge, according to Highways England. New figures released by Highways England show that journeys over the Dartford Crossing, which cost £62million (US$95 million) to convert to free-flow tolling, are up to 56 per cent faster than before payment barriers were removed. Drivers at peak times save up to 14 minutes southbound and seven minutes northbound.
  • April 4, 2023
    Sice systems future proof Fehmarnbelt Tunnel
    Picking up the electro-mechanical contract for the Fehmarnbelt Tunnel was a milestone, according to David Calero Monteagudo, head of global ITS and tunnel business for Spanish company Sice. David Arminas finds out more
  • November 13, 2014
    Colombian highway sees ITS tested to the extreme
    One of the most challenging road construction and ITS projects currently underway is the upgrading of the road from Bogota to Villavicencio. Currently it takes four hours to make the 86km journey between Bogota and Villavicencio using the existing single lane in each direction road which passes through some very challenging terrain. It is the only ground connection between central Colombia and the eastern region which represents 40% of the country’s territory.
  • February 25, 2015
    Substantial savings from smarter street lighting
    As authorities strive to reduce expenditure and carbon emissions, Colin Sowman looks at some of the smart ways of managing street lighting while containing costs and maintaining safety. Street lighting can account for 40% of an authority’s energy consumption. So, faced with the need to reduce outgoings, some authorities are looking for smart ways of managing street lighting or even turning off swathes of street lights in the small hours. Back in 2008 the E-street Initiative report concluded that authorities