Skip to main content

Lorries hitting rail bridges peak in October causing hours of delays and cancellations, Network Rail

Hundreds of thousands of rail passengers will suffer hours of delays and cancellations this month as figures for oversized lorries hitting low bridges (bridge-strikes) peaked in October/ November to around ten reported incidents every day, according to a new campaign by Network Rail. In addition, there are 2,000 bridge strikes every year costing the taxpayer some £23 million ($30 million) in damages and delays.
October 26, 2017 Read time: 3 mins
Hundreds of thousands of rail passengers will suffer hours of delays and cancellations this month as figures for oversized lorries hitting low bridges (bridge-strikes) peaked in October/ November to around ten reported incidents every day, according to a new campaign by 5021 Network Rail. In addition, there are 2,000 bridge strikes every year costing the taxpayer some £23 million ($30 million) in damages and delays. On average, each bridge strike costs £13,500 ($17,000) and causes two hour delays to train services.

Stuntney Bridge in Ely, Cambridgeshire, is the most bashed bridge in Britain and has been hit 113 times since 2009. Kenworthy Road Bridge in Homerton has had 99 strikes in the last eight years, followed by a bridge on Thurlow Park Road in Tulse Hill which has been struck 92 times.

Both Network Rail and TfL are urging drivers to fully understand the size of their vehicles and plan their route to avoid low bridges, as findings revealed that 43% of drivers admit to not knowing their vehicle size. In addition, 52% admit to not taking low bridges into account when planning their journeys.

Network Rail has launched ‘what the truck’ campaign aimed at HGV drivers, which will involve engaging haulage and public transport industries and fitting steel beams on rail bridges where there are a high number of strikes to reduce the impact. The scheme will also include working with local authorities to ensure road signs displaying bridge heights are correct as well as calling for stricter penalty enforcement for drivers when strikes do happen.

The rail infrastructure company will also visit logistics companies to raise awareness of the issue and work with trade bodies such as the 6985 Road Haulage Association.

Research suggests that the increase in bridge crashes may be due to the hour change and increased deliveries ahead of Christmas with most strikes happening between 10am-11am, but remaining high until around 6pm.

Sir Peter Hendy, chairman of Network Rail, said: “It's only a matter of time before road or rail users are killed as a result of this carelessness; we need professional HGV drivers and their operator employers to get behind and support this campaign to eradicate bridge bashing, which reaches epidemic levels at this time of year."

David Pickering, Chief Operating Officer at 3870 Eddie Stobart, said: “We are pleased to be supporting Network Rail’s campaign as we have worked really hard to highlight the importance of our drivers knowing the height of their vehicles. As well as carefully planning routes to avoid low bridges, we carry out manual vehicle checks at the beginning of every journey which requires the driver to adjust the trailer height on a measurement in the cab. Additionally, we are installing software early next year which will warn drivers with an audible alarm when they are approaching a bridge. We have also tried some quirky ways of engaging drivers in the issue including our giant giraffe ‘Bridget’ in our Training Academy which serves as a constant reminder to our drivers of why they need to be bridge aware!”
UTC

Related Content

  • August 20, 2024
    '190,000 trips' on day 1 of Sydney Metro extension
    15.5km extension means 2,645 new metro services will travel through city each week
  • October 10, 2018
    The search for travel management's Holy Grail
    Combining accurate network estimates and forecasts with real-time information is the way to deal with traffic hot spots. Alan Dron looks at products which aim to achieve just that. Traffic management authorities have for years been trying to get ahead of the game. Instead of reacting to situations, they want to be able to head them off as they occur – or even before they happen. Finding that Holy Grail of successfully anticipating problems will save time, tension and tempers on city streets. Two new system
  • April 27, 2015
    Rail signalling system ‘could be liable to hacking’
    A new rail signalling system to be installed across the UK could be liable to hacking, a government adviser has warned. Professor David Stupples told the BBC that the European Rail Traffic Management system (ERTMS) could be exposed to malicious software, or malware, and used to cause an accident perhaps telling the system the train is slowing when down when it is speeding up. "However, he said governments aren't complacent."Certain ministers know this is absolutely possible and they are worried about
  • June 14, 2018
    Keeping people on track is RATP’s raison d’etre
    In Paris, RATP Group’s autonomous Metro Line 1 is carrying 750,000 people a day across the city. Ben Spencer is invited into the control room to take a look at how the system works Paris is visited by millions of tourists each year, keen to see for themselves stunning attractions such as the Eiffel Tower, Arc de Triomphe, Notre-Dame, the Louvre, the Seine and all the rest. But while the best-known sites of the City of Light tend to be on the surface, there is a lot going on below those iconic grand boule