Skip to main content

London’s new Cycle Superhighway given the green light

The Mayor of London, Sadiq Khan, and Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.
September 1, 2016 Read time: 2 mins

The Mayor of London, Sadiq Khan, and 1466 Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.

Once complete the full North-South route, also known as Cycle Superhighway 6 (CS6), will provide a safe and direct route for cyclists across central London between Elephant and Castle and King’s Cross. 5km in total, the route will be either fully separated from traffic, or on quiet back streets. At its northern end, the route will connect both with the planned Quietway 2, and Central London Grid routes, allowing cyclists to travel safely to Hackney, Walthamstow, Camden and Swiss Cottage and opening up the city to cycling.

TfL has closely considered all of the responses received in the consultation for this scheme and incorporated several changes to the original plan to address the concerns of local residents and stakeholders. A detailed design will now be developed and, subject to approval from Camden Council and Islington Council, construction will begin in spring 2017.

Pedestrians will also benefit from the plans with 1,600sq metres of new footway along the route as well as 14 new or upgraded signalised pedestrian crossings with tactile paving and pedestrian countdown technology. It will also provide a much improved pedestrian crossing at Farringdon Road for the many thousands of Thameslink passengers who use Farringdon station each day and for those who will use the new Crossrail station in two years’ time.

For more information on companies in this article

Related Content

  • APT Skidata upgrades shopping centre parking
    March 12, 2013
    Parking specialist APT Skidata has returned to refresh and substantially upgrade the parking technology at Castle Quay Shopping Centre in Banbury, Oxfordshire, UK, more than twelve years after it originally installed the centre’s parking systems. Castle Quay has over eighty retail units and two visitor car parks, offering a total of 820 spaces to the 700,000 shoppers that park at the centre each year.
  • Parsons wins Engineering Excellence Grand Award
    February 14, 2017
    US engineering services firm Parsons has received the 2017 Grand Award in the transportation category from the American Council of Engineering Companies of Missouri for the Columbia I 70 Bridges design build project. Parsons was the lead designer for this US$18 million project for the Missouri Department of Transportation, which involved replacing six deficient bridges with five new weathering steel plate girder bridges while accommodating 80,000+ vehicles per day on the road. Built in 1957, the existing
  • Movmi and Loud Mobility to run shared mobility summer school
    June 24, 2024
    EIT Urban Mobility-certified course takes place in London from 20-22 August 2024
  • Cost benefit: Toronto retimings tame traffic trauma
    July 19, 2018
    Canada’s largest city reckons that it is saving its taxpayers’ money simply by altering the way traffic lights work. David Crawford reviews Toronto’s ambitious plans to ease congestion Toronto, Canada’s largest metropolis (and the fourth largest in North America), has saved its residents CAN$53 (US$42.4) for every CAN$1 (US$0.80) spent over a 2012-2016 traffic signal retiming programme, according to figures released by its Transportation Services Division. The programme covered 1,275 signals (the city’s