Skip to main content

London’s new Cycle Superhighway given the green light

The Mayor of London, Sadiq Khan, and Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.
September 1, 2016 Read time: 2 mins

The Mayor of London, Sadiq Khan, and 1466 Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.

Once complete the full North-South route, also known as Cycle Superhighway 6 (CS6), will provide a safe and direct route for cyclists across central London between Elephant and Castle and King’s Cross. 5km in total, the route will be either fully separated from traffic, or on quiet back streets. At its northern end, the route will connect both with the planned Quietway 2, and Central London Grid routes, allowing cyclists to travel safely to Hackney, Walthamstow, Camden and Swiss Cottage and opening up the city to cycling.

TfL has closely considered all of the responses received in the consultation for this scheme and incorporated several changes to the original plan to address the concerns of local residents and stakeholders. A detailed design will now be developed and, subject to approval from Camden Council and Islington Council, construction will begin in spring 2017.

Pedestrians will also benefit from the plans with 1,600sq metres of new footway along the route as well as 14 new or upgraded signalised pedestrian crossings with tactile paving and pedestrian countdown technology. It will also provide a much improved pedestrian crossing at Farringdon Road for the many thousands of Thameslink passengers who use Farringdon station each day and for those who will use the new Crossrail station in two years’ time.

For more information on companies in this article

Related Content

  • NYC aims to improve transport accessibility
    October 26, 2021
    Proposal includes easement certification and a transit improvement bonus
  • TfL chooses Sopra to develop software for London roads
    September 3, 2019
    Transport for London (TfL) has chosen IT company Sopra Steria to develop software to help tackle congestion and road danger in the UK capital. TfL is responsible for managing 580km of London’s roads, as well as managing a range of assets including 6,000 traffic lights, its tunnels and some bridges. The partners will seek to develop a control centre system that provides a single view of everything happening on the road network. Glynn Barton, TfL's director of network management, says the partnership wi
  • Tier to discourage reckless riding 
    June 16, 2021
    E-scooter firm won't charge riders for time spent in traffic or waiting at red lights
  • London may trial Dutch-style roundabouts
    April 30, 2013
    Roundabouts similar to those used in the Netherlands, which separate cyclists from cars and give them priority, could be used in London as early as next year, according to Andrew Gilligan, the city's cycling commissioner. The layout means cyclists are in the clear line of sight of drivers when vehicles exit the roundabout. The trial forms part of the mayor of London's Vision for Cycling. Over 600 people have been involved so far and the effects on safety and capacity will be studied as well as the impact o