Skip to main content

London’s new Cycle Superhighway given the green light

The Mayor of London, Sadiq Khan, and Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.
September 1, 2016 Read time: 2 mins

The Mayor of London, Sadiq Khan, and 1466 Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.

Once complete the full North-South route, also known as Cycle Superhighway 6 (CS6), will provide a safe and direct route for cyclists across central London between Elephant and Castle and King’s Cross. 5km in total, the route will be either fully separated from traffic, or on quiet back streets. At its northern end, the route will connect both with the planned Quietway 2, and Central London Grid routes, allowing cyclists to travel safely to Hackney, Walthamstow, Camden and Swiss Cottage and opening up the city to cycling.

TfL has closely considered all of the responses received in the consultation for this scheme and incorporated several changes to the original plan to address the concerns of local residents and stakeholders. A detailed design will now be developed and, subject to approval from Camden Council and Islington Council, construction will begin in spring 2017.

Pedestrians will also benefit from the plans with 1,600sq metres of new footway along the route as well as 14 new or upgraded signalised pedestrian crossings with tactile paving and pedestrian countdown technology. It will also provide a much improved pedestrian crossing at Farringdon Road for the many thousands of Thameslink passengers who use Farringdon station each day and for those who will use the new Crossrail station in two years’ time.

Related Content

  • FTA launches cycle-friendly HGV sat-nav
    May 28, 2013
    As part of its continuing efforts to raises safety standards in the logistics industry, the UK’s Freight Transport Association (FTA) launched what it says is the world’s first satellite navigation system incorporating an HGV Cyclist Alert system. Currently only available in London, the Pro Nav 420’s HGV Cyclist Alert warns the truck driver when approaching a section of road that has been designated by Transport for London (TfL) as a “HGV/Cyclist convergence area”, such as junctions where large numbers of HG
  • Cycling data suggests rise in bike use in European cities
    February 16, 2024
    New figures from France, Italy and the UK demonstrate uptick in active travel
  • Bespoke ITS is helping to reduced collisions on America’s rural roads
    October 22, 2014
    David Crawford cherrypicks conference and award highlights Almost 30% of all US citizens live in rural areas or very small communities, and 34 of the 50 states exceed this level in their own populations, with the proportions rising as high as 85%. And although rural routes carry only 35% of all traffic, the accidents that occur on them account for some 54% of all US road traffic accident deaths.
  • New Zealand company wins London pedestrian crossing equipment contract
    March 22, 2012
    New Zealand road signal company Traffic Systems has won a contract to supply Transport for London (TfL) with pedestrian crossing equipment. It is one of two companies that have been selected to provide countdown timers for some 6,000 intersections in England’s capital. The company’s initial order, its first international contract, is for 300 units. However, Andrea Ransley, co-owner of Traffic Systems, says she is confident of further orders and says the deal is potentially worth tens of millions of dollars.