Skip to main content

London’s new Cycle Superhighway given the green light

The Mayor of London, Sadiq Khan, and Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.
September 1, 2016 Read time: 2 mins

The Mayor of London, Sadiq Khan, and 1466 Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.

Once complete the full North-South route, also known as Cycle Superhighway 6 (CS6), will provide a safe and direct route for cyclists across central London between Elephant and Castle and King’s Cross. 5km in total, the route will be either fully separated from traffic, or on quiet back streets. At its northern end, the route will connect both with the planned Quietway 2, and Central London Grid routes, allowing cyclists to travel safely to Hackney, Walthamstow, Camden and Swiss Cottage and opening up the city to cycling.

TfL has closely considered all of the responses received in the consultation for this scheme and incorporated several changes to the original plan to address the concerns of local residents and stakeholders. A detailed design will now be developed and, subject to approval from Camden Council and Islington Council, construction will begin in spring 2017.

Pedestrians will also benefit from the plans with 1,600sq metres of new footway along the route as well as 14 new or upgraded signalised pedestrian crossings with tactile paving and pedestrian countdown technology. It will also provide a much improved pedestrian crossing at Farringdon Road for the many thousands of Thameslink passengers who use Farringdon station each day and for those who will use the new Crossrail station in two years’ time.

Related Content

  • July 8, 2019
    London needs just one road user charge, says report
    London’s patchwork of road charging schemes should be replaced by a single, distance-based user charge, according to new research. Apart from anything else, it would be much fairer… The UK capital’s multiple road charging schemes require a radical overhaul, according to a new report by the Centre for London thinktank. The suggested solution is to replace existing levies on drivers with a single, distance-based user charge which would more fairly reflect how much, and at what time, people are using London
  • October 8, 2015
    PTV Group retains TfL modelling software contract
    PTV Group has been appointed as one of the framework contractors for three years to provide tactical and microsimulation operational modelling software to Transport for London (TfL). TfL uses PTV Visum operational software for the development of the Operational Network Evaluation (ONE) model, a tactical highway assignment model for London, said to be the largest of its type in the world. An earlier version of the ONE model, covering the central London road network, was successfully used for the operatio
  • July 13, 2020
    Manchester focuses on Cyclops junction
    Northern English city has its eye on a better cycling experience
  • May 8, 2015
    Encouraging cycling: small outlay and big returns
    Pete Zanzottera explains why considering cycling in urban planning is a win-win situation. The Cycling Delivery Plan published by the UKs Department for Transport (UKDfT) contains 13 mentions of ‘cycle proofing’ a term that has been growing in use, but what does it mean, and have we got the wrong word? Should we instead be proving that we can create infrastructure that invites cyclists into the transport network?