Skip to main content

London’s new Cycle Superhighway given the green light

The Mayor of London, Sadiq Khan, and Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.
September 1, 2016 Read time: 2 mins

The Mayor of London, Sadiq Khan, and 1466 Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.

Once complete the full North-South route, also known as Cycle Superhighway 6 (CS6), will provide a safe and direct route for cyclists across central London between Elephant and Castle and King’s Cross. 5km in total, the route will be either fully separated from traffic, or on quiet back streets. At its northern end, the route will connect both with the planned Quietway 2, and Central London Grid routes, allowing cyclists to travel safely to Hackney, Walthamstow, Camden and Swiss Cottage and opening up the city to cycling.

TfL has closely considered all of the responses received in the consultation for this scheme and incorporated several changes to the original plan to address the concerns of local residents and stakeholders. A detailed design will now be developed and, subject to approval from Camden Council and Islington Council, construction will begin in spring 2017.

Pedestrians will also benefit from the plans with 1,600sq metres of new footway along the route as well as 14 new or upgraded signalised pedestrian crossings with tactile paving and pedestrian countdown technology. It will also provide a much improved pedestrian crossing at Farringdon Road for the many thousands of Thameslink passengers who use Farringdon station each day and for those who will use the new Crossrail station in two years’ time.

UTC

Related Content

  • April 2, 2024
    No city is a traffic island
    Beate Kubitz reflects on the rising tide of suburban drivers - and how cities across Europe are dealing with them as worries over air quality multiply
  • February 12, 2013
    Setting new Horizons for highways maintenance
    Rochdale Metropolitan Borough Council (MBC) is targeting priority highways maintenance schemes with strategic support from Yotta DCL, whose consultants used its web-based Horizons visualised asset management software to create works programmes for the carriageway and footway network across Rochdale’s four townships and their wards. This latest contract builds on previous work done by Yotta DCL, including coarse visual inspections (CVI), scanner surveys, footway network surveys and video asset inventory coll
  • December 6, 2018
    Croix-Rousse demonstrates art of tunnel safety
    How do you expand a tunnel when it has reached its traffic limit? Build another tunnel in parallel to it. That, at least, is what Lyon did and opened the 1.7km Croix-Rousse dual-tunnel system in 2013. The smaller, new €283 million tunnel has become a symbol of Lyon’s intention to reinvent itself as one of France’s most innovative mobility centres, said Mathieu Hermen, head of operations at La Metropole de Lyon. Construction of the original two-lane tunnel under one of the city’s most densely populated arro
  • June 6, 2024
    Digital twins promise no jam tomorrow
    Every year, Transport for London helps make billions of road journeys congestion-free - but could it do better? Digital twin and graph technology are starting to make London less congested and greener, says database expert Aaron Holt