Skip to main content

London’s new Cycle Superhighway given the green light

The Mayor of London, Sadiq Khan, and Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.
September 1, 2016 Read time: 2 mins

The Mayor of London, Sadiq Khan, and 1466 Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.

Once complete the full North-South route, also known as Cycle Superhighway 6 (CS6), will provide a safe and direct route for cyclists across central London between Elephant and Castle and King’s Cross. 5km in total, the route will be either fully separated from traffic, or on quiet back streets. At its northern end, the route will connect both with the planned Quietway 2, and Central London Grid routes, allowing cyclists to travel safely to Hackney, Walthamstow, Camden and Swiss Cottage and opening up the city to cycling.

TfL has closely considered all of the responses received in the consultation for this scheme and incorporated several changes to the original plan to address the concerns of local residents and stakeholders. A detailed design will now be developed and, subject to approval from Camden Council and Islington Council, construction will begin in spring 2017.

Pedestrians will also benefit from the plans with 1,600sq metres of new footway along the route as well as 14 new or upgraded signalised pedestrian crossings with tactile paving and pedestrian countdown technology. It will also provide a much improved pedestrian crossing at Farringdon Road for the many thousands of Thameslink passengers who use Farringdon station each day and for those who will use the new Crossrail station in two years’ time.

UTC

Related Content

  • July 7, 2017
    Bristol’s buses trial CycleEye detection system
    Fusion Processing’s Jim Hutchinson looks at a two-year trial of the company’s cyclist detection system. Is cycling in a city dangerous? Well, that depends where you are and how you view statistics. Malmö is far more bike-friendly than Mumbai and the risk can either be perceived as small - one death per 29 million miles cycled in the UK in 2013 - or large - that equated to 109 deaths in the same year. Whatever your personal take on the data, the effect of these accidents can be felt indirectly too. News of c
  • December 17, 2014
    Smart parking at London Underground
    Transport for London (TfL) is to implement a ‘smart parking’ system at 31 of its off-street car parks that support key locations across the London Underground network. 1,500 of Smart Parking’s RFID-equipped SmartEye vehicle detection sensors, linked via SmartLink data transmitters into the company’s SmartRep management application, will be installed across TfL’s off-street car park network. The five-year agreement, which will include the provision of equipment, maintenance and hosting, will enable car pa
  • March 18, 2014
    Transurban announces preferred contractor for NorthConnex
    Melbourne-based toll-road operator Transurban Group has announced that the consortium Lend Lease Bouygues is set to design and build the Sydney, Australia, NorthConnex tunnel link between the M1 and M2 motorways in the city’s northwest. The nine kilometre, 80 km/h tolled link involves two motorway tunnels, built with a three lane capacity for future growth but initially marked for two lanes each way. It provides the missing link in the National Highway Network and offers a safe and more efficient way of
  • June 12, 2023
    How to outsmart the rat runners - use data
    Proactively solving transport problems with powerful empirical evidence is appealing: Emily Bobis of Compass IoT explains how vehicle-generated data can be the missing link