Skip to main content

London’s new Cycle Superhighway given the green light

The Mayor of London, Sadiq Khan, and Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.
September 1, 2016 Read time: 2 mins

The Mayor of London, Sadiq Khan, and 1466 Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.

Once complete the full North-South route, also known as Cycle Superhighway 6 (CS6), will provide a safe and direct route for cyclists across central London between Elephant and Castle and King’s Cross. 5km in total, the route will be either fully separated from traffic, or on quiet back streets. At its northern end, the route will connect both with the planned Quietway 2, and Central London Grid routes, allowing cyclists to travel safely to Hackney, Walthamstow, Camden and Swiss Cottage and opening up the city to cycling.

TfL has closely considered all of the responses received in the consultation for this scheme and incorporated several changes to the original plan to address the concerns of local residents and stakeholders. A detailed design will now be developed and, subject to approval from Camden Council and Islington Council, construction will begin in spring 2017.

Pedestrians will also benefit from the plans with 1,600sq metres of new footway along the route as well as 14 new or upgraded signalised pedestrian crossings with tactile paving and pedestrian countdown technology. It will also provide a much improved pedestrian crossing at Farringdon Road for the many thousands of Thameslink passengers who use Farringdon station each day and for those who will use the new Crossrail station in two years’ time.

UTC

Related Content

  • May 25, 2022
    Cubic’s holistic view of traffic management
    How can cities and transit agencies ease congested roadways? Andy Taylor of Cubic Transportation Systems suggests it would help to take a more holistic view of the problem
  • January 13, 2025
    London's new Silvertown Tunnel set to open
    TfL says average peak journey times expected to be 20 minutes quicker
  • May 5, 2015
    Paris launches ambitious new cycling plan
    Paris has launched its 2015-2020 cycling strategy, which aims to double the length of the city's cycle network and triple the number of Parisians cycling every day. The strategy was developed with the input of almost 7,000 stakeholders in a consultation period from December 2014 to January 2015 aims to help deal with Paris's high air pollution and concentration of particulates, which caused heavy smog earlier this year and in spring 2015. A total of US$166 million has been allocated to realise the str
  • June 6, 2025
    British Columbia's highway corridors show it’s good to share
    The Canadian province is advocating harmony along its major roads, setting aside major funding for projects to allow vehicles and other modes to operate safely side by side, reports David Arminas