Skip to main content

London’s new Cycle Superhighway given the green light

The Mayor of London, Sadiq Khan, and Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.
September 1, 2016 Read time: 2 mins

The Mayor of London, Sadiq Khan, and 1466 Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.

Once complete the full North-South route, also known as Cycle Superhighway 6 (CS6), will provide a safe and direct route for cyclists across central London between Elephant and Castle and King’s Cross. 5km in total, the route will be either fully separated from traffic, or on quiet back streets. At its northern end, the route will connect both with the planned Quietway 2, and Central London Grid routes, allowing cyclists to travel safely to Hackney, Walthamstow, Camden and Swiss Cottage and opening up the city to cycling.

TfL has closely considered all of the responses received in the consultation for this scheme and incorporated several changes to the original plan to address the concerns of local residents and stakeholders. A detailed design will now be developed and, subject to approval from Camden Council and Islington Council, construction will begin in spring 2017.

Pedestrians will also benefit from the plans with 1,600sq metres of new footway along the route as well as 14 new or upgraded signalised pedestrian crossings with tactile paving and pedestrian countdown technology. It will also provide a much improved pedestrian crossing at Farringdon Road for the many thousands of Thameslink passengers who use Farringdon station each day and for those who will use the new Crossrail station in two years’ time.

UTC

Related Content

  • May 21, 2015
    First pan-London Car Club Action Plan launched
    Around 85 per cent of UK car club members already based in London New plan will help reach new joint target of one million London car club members by 2025 Future growth of car clubs will help improve London’s air quality and reduce congestion in the Capital A new ‘strategy for car clubs’ in London has been launched today (21 May), to encourage residents and businesses across the capital to sign up to car club schemes as an alternative to direct car ownership. The new action plan, jointly developed b
  • January 18, 2024
    National Cycle Network plan for freewheeling Ireland
    Routes will link to transport hubs to ensure more comprehensive mobility for people
  • October 18, 2023
    TfL and Google Maps riding side by side on London cycling
    Google has added hundreds of kilometres of new cycle lane data to its mapping products
  • May 8, 2015
    Low-costs solutions to improve pedestrian safety
    David Crawford welcomes low-cost safety initiatives for pedestrians in America. Some 10 people die each week in accidents on crosswalks in the US, that’s more than 10% of all pedestrian fatalities in road traffic incidents - the number of which is running at a five-year high. Ensuring crosswalks are safe is key in supporting the growing enthusiasm for walking as a travel mode. In the last decade of the 20th century, numbers walking to work in the US fell by 26%; while, as recently as 2012, Americans were e