Skip to main content

London’s new Cycle Superhighway given the green light

The Mayor of London, Sadiq Khan, and Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.
September 1, 2016 Read time: 2 mins

The Mayor of London, Sadiq Khan, and 1466 Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.

Once complete the full North-South route, also known as Cycle Superhighway 6 (CS6), will provide a safe and direct route for cyclists across central London between Elephant and Castle and King’s Cross. 5km in total, the route will be either fully separated from traffic, or on quiet back streets. At its northern end, the route will connect both with the planned Quietway 2, and Central London Grid routes, allowing cyclists to travel safely to Hackney, Walthamstow, Camden and Swiss Cottage and opening up the city to cycling.

TfL has closely considered all of the responses received in the consultation for this scheme and incorporated several changes to the original plan to address the concerns of local residents and stakeholders. A detailed design will now be developed and, subject to approval from Camden Council and Islington Council, construction will begin in spring 2017.

Pedestrians will also benefit from the plans with 1,600sq metres of new footway along the route as well as 14 new or upgraded signalised pedestrian crossings with tactile paving and pedestrian countdown technology. It will also provide a much improved pedestrian crossing at Farringdon Road for the many thousands of Thameslink passengers who use Farringdon station each day and for those who will use the new Crossrail station in two years’ time.

For more information on companies in this article

Related Content

  • Research shows smart charging can be key solution to challenge of network demand from EVs
    September 5, 2017
    The UK Electric Nation project is due to announce its initial findings on the first day of the Cenex Low Carbon Vehicle event (LCV2017) this week, which will show that smart charging can provide a key solution to the challenge of the demand from increasing numbers of electric vehicles (EVs) on electricity networks.
  • Highways Agency plans to increase capacity of M4
    March 19, 2014
    The UK Highways Agency is holding a series of public exhibitions to inform road users, local residents and businesses about proposals to transform the M4 into one of the longest stretches of ‘smart motorway’ in England by 2021. The improvement, on a 32-mile stretch between junction 3 at Hayes in London, and junction 12 at Theale in Berkshire, would increase capacity, improve journey reliability and maintain safety. The proposals are part of the Government’s investment into England’s motorways and majo
  • Arizona chooses consortium for its largest-ever highway project
    January 4, 2016
    The Arizona Department of Transportation (ADOT) has selected Connect 202 Partners as the preferred developer for its first highway public-private partnership, the Loop 202 South Mountain Freeway. The consortium includes Fluor Enterprises, Granite Construction and Ames Construction, with Parsons Brinckerhoff as the lead designer. The South Mountain Freeway will be constructed with four lanes in each direction - three general-use lanes and one HOV lane - and includes modern features including rubberised
  • Electreon completes first US dynamic charging project
    December 8, 2023
    Testing of inductive charging technology along the Detroit road will start next year