Skip to main content

London’s new Cycle Superhighway given the green light

The Mayor of London, Sadiq Khan, and Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.
September 1, 2016 Read time: 2 mins

The Mayor of London, Sadiq Khan, and 1466 Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.

Once complete the full North-South route, also known as Cycle Superhighway 6 (CS6), will provide a safe and direct route for cyclists across central London between Elephant and Castle and King’s Cross. 5km in total, the route will be either fully separated from traffic, or on quiet back streets. At its northern end, the route will connect both with the planned Quietway 2, and Central London Grid routes, allowing cyclists to travel safely to Hackney, Walthamstow, Camden and Swiss Cottage and opening up the city to cycling.

TfL has closely considered all of the responses received in the consultation for this scheme and incorporated several changes to the original plan to address the concerns of local residents and stakeholders. A detailed design will now be developed and, subject to approval from Camden Council and Islington Council, construction will begin in spring 2017.

Pedestrians will also benefit from the plans with 1,600sq metres of new footway along the route as well as 14 new or upgraded signalised pedestrian crossings with tactile paving and pedestrian countdown technology. It will also provide a much improved pedestrian crossing at Farringdon Road for the many thousands of Thameslink passengers who use Farringdon station each day and for those who will use the new Crossrail station in two years’ time.

For more information on companies in this article

Related Content

  • €7.2bn 'green' upgrade for Italian motorway
    November 21, 2022
    The A22 between Modena and Bolzano will offer hydrogen filling and EV charging
  • USDoT pilots show win-win potential for connected vehicles
    December 19, 2017
    Pete Goldin discovers the state of play with connected vehicles trials in the US and the impact of Hurricane Irma on Tampa’s pilot. The US Department of Transportation’s (USDoT’s) connected vehicle (CV) pilot sites have moved into phase 2 of the deployment programme– design, build, test and, maybe most importantly, collaborate.
  • VivaCity captures simple zebra data
    January 23, 2023
    Sensors will help establish VRU/driver behaviour changes at 'non-prescribed' crossings
  • Norway to build cycle highways
    March 8, 2016
    Norway is proposing to spend US$923 million and build ten dual-lane bicycle pathways that would link the country's nine largest cities and extend to their suburbs, allowing longer-distance cyclists to travel with a speed and safety hitherto impossible. The effort is part of the country's National Transit Plan, which seeks to reduce emissions from vehicular traffic. Challenges, however, include dark winters, steep mountains and the small number of Norwegians who use cycles. According to CityLab, the ef