Skip to main content

London’s new Cycle Superhighway given the green light

The Mayor of London, Sadiq Khan, and Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.
September 1, 2016 Read time: 2 mins

The Mayor of London, Sadiq Khan, and 1466 Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.

Once complete the full North-South route, also known as Cycle Superhighway 6 (CS6), will provide a safe and direct route for cyclists across central London between Elephant and Castle and King’s Cross. 5km in total, the route will be either fully separated from traffic, or on quiet back streets. At its northern end, the route will connect both with the planned Quietway 2, and Central London Grid routes, allowing cyclists to travel safely to Hackney, Walthamstow, Camden and Swiss Cottage and opening up the city to cycling.

TfL has closely considered all of the responses received in the consultation for this scheme and incorporated several changes to the original plan to address the concerns of local residents and stakeholders. A detailed design will now be developed and, subject to approval from Camden Council and Islington Council, construction will begin in spring 2017.

Pedestrians will also benefit from the plans with 1,600sq metres of new footway along the route as well as 14 new or upgraded signalised pedestrian crossings with tactile paving and pedestrian countdown technology. It will also provide a much improved pedestrian crossing at Farringdon Road for the many thousands of Thameslink passengers who use Farringdon station each day and for those who will use the new Crossrail station in two years’ time.

For more information on companies in this article

Related Content

  • HNTB to lead the most ambitious US AET conversion programme
    July 26, 2012
    HNTB Corporation has been selected by the Pennsylvania Turnpike Commission to serve as programme manager to lead the potential implementation of a cashless, all-electronic toll (AET) collection system. The implementation of the new programme across the entire 885km (550 mile) Pennsylvania Turnpike system, which includes more than 70 toll plazas serving more than 186.5 million vehicles and generating more than US$700 million annually, is said to be the largest and most ambitious AET conversion in North Ameri
  • HNTB to lead the most ambitious US AET conversion programme
    July 26, 2012
    HNTB Corporation has been selected by the Pennsylvania Turnpike Commission to serve as programme manager to lead the potential implementation of a cashless, all-electronic toll (AET) collection system. The implementation of the new programme across the entire 885km (550 mile) Pennsylvania Turnpike system, which includes more than 70 toll plazas serving more than 186.5 million vehicles and generating more than US$700 million annually, is said to be the largest and most ambitious AET conversion in North Ameri
  • FHWA collaborative framework on automated driving systems: an explainer
    September 26, 2023
    USDoT FHWA has put together a collaborative framework to help secure the roll-out of automated driving systems in the US. John Harding of FHWA explains the thinking…
  • Telent signals Yorkshire maintenance win
    May 21, 2021
    Contract involves responding to lamp and detector faults and runs until March 2025