Skip to main content

London’s new Cycle Superhighway given the green light

The Mayor of London, Sadiq Khan, and Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.
September 1, 2016 Read time: 2 mins

The Mayor of London, Sadiq Khan, and 1466 Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.

Once complete the full North-South route, also known as Cycle Superhighway 6 (CS6), will provide a safe and direct route for cyclists across central London between Elephant and Castle and King’s Cross. 5km in total, the route will be either fully separated from traffic, or on quiet back streets. At its northern end, the route will connect both with the planned Quietway 2, and Central London Grid routes, allowing cyclists to travel safely to Hackney, Walthamstow, Camden and Swiss Cottage and opening up the city to cycling.

TfL has closely considered all of the responses received in the consultation for this scheme and incorporated several changes to the original plan to address the concerns of local residents and stakeholders. A detailed design will now be developed and, subject to approval from Camden Council and Islington Council, construction will begin in spring 2017.

Pedestrians will also benefit from the plans with 1,600sq metres of new footway along the route as well as 14 new or upgraded signalised pedestrian crossings with tactile paving and pedestrian countdown technology. It will also provide a much improved pedestrian crossing at Farringdon Road for the many thousands of Thameslink passengers who use Farringdon station each day and for those who will use the new Crossrail station in two years’ time.

For more information on companies in this article

Related Content

  • ITS needs to talk the talk as well as walk the walk
    March 24, 2014
    The US automated enforcement market is in rude health as the number of systems and applications continues to grow and broaden. Jason Barnes reports. Blessed and cursed – arguably, in equal measure – with a constitution which stresses the right to self-expression and determination, the US has had a harder journey than most to the more widespread use of automated traffic enforcement systems. In some cases, opposition to the concept has been extreme – including the murder of a roadside civil enforcement offici
  • Case study highlights model-practices for highway security
    October 8, 2015
    A US$229 million Costain construction site along 14 kilometres of highway has provided material for a model-practice case study issued by UK-based security solution provider VPS Site Security. The Heads of Valleys road follows the southern boundary of the Brecon Beacons National Park in South Wales and is undergoing a major improvements scheme. It presents a significant engineering and environmental challenge to secure safely, including heavy traffic, remote and difficult terrains with numerous access po
  • Westminster detects disabled parking bay abuse
    March 16, 2016
    Westminster trials scheme to detect non-qualifying motorists using disabled parking bays. The provision of disabled parking bays has become commonplace - but so has the abuse of these bays by able-bodied motorists. Now, London’s Westminster City Council is running a trial of technology that detects when a vehicle is illegally parked in a disabled bay.
  • Kenya WIM system cuts four days off journey times
    March 18, 2014
    Shem Oirere looks at how weigh-in-motion is helping to streamline the trucking industry in Kenya. Kenya, East Africa’s largest economy, is streamlining trucking operations on its section of the 8,800km Northern Corridor. It is both reducing the number of weighbridges and automating the remaining ones in an effort to improve efficiency and eliminate corruption.The Northern Corridor is a major gateway through Kenya to the landlocked countries of Uganda, Rwanda, Burundi, Democratic Republic of Congo and Sou