Skip to main content

London’s new Cycle Superhighway given the green light

The Mayor of London, Sadiq Khan, and Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.
September 1, 2016 Read time: 2 mins

The Mayor of London, Sadiq Khan, and 1466 Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.

Once complete the full North-South route, also known as Cycle Superhighway 6 (CS6), will provide a safe and direct route for cyclists across central London between Elephant and Castle and King’s Cross. 5km in total, the route will be either fully separated from traffic, or on quiet back streets. At its northern end, the route will connect both with the planned Quietway 2, and Central London Grid routes, allowing cyclists to travel safely to Hackney, Walthamstow, Camden and Swiss Cottage and opening up the city to cycling.

TfL has closely considered all of the responses received in the consultation for this scheme and incorporated several changes to the original plan to address the concerns of local residents and stakeholders. A detailed design will now be developed and, subject to approval from Camden Council and Islington Council, construction will begin in spring 2017.

Pedestrians will also benefit from the plans with 1,600sq metres of new footway along the route as well as 14 new or upgraded signalised pedestrian crossings with tactile paving and pedestrian countdown technology. It will also provide a much improved pedestrian crossing at Farringdon Road for the many thousands of Thameslink passengers who use Farringdon station each day and for those who will use the new Crossrail station in two years’ time.

For more information on companies in this article

Related Content

  • UK government invests £7m to boost cycle safety
    February 27, 2018
    The UK government will invest £7m ($5m) in cycling projects to improve road safety and create more bike-friendly areas that encourage more people to cycle as part of everyday journeys. It is part of the Department of Transport’s (DoT’s) cycle safety review, which aims to ensure that the country’s roads are as safe as possible for everyone using them. Eight cities, which have already received help from the government to promote cycling, will be able to bid for an additional £6.5m ($4.6m) of funding to
  • London leads on open transport data
    May 16, 2016
    London has come out on top of an analysis of the performance of several major cities in providing open data on transport and mapping. The Future Spaces Foundation, a charity that studies living spaces, has said in its Vital Cities: Transport Systems Scorecard that London’s record of providing open access to real time transport data is the best example of data sharing. The Scorecard analyses the transport networks of 12 cities around the world on indicators ranging from breathability to the density of
  • Dubai metro - the world's longest automated rail system
    July 31, 2012
    David Crawford reviews the recent opening of Dubai's Red Line. The US$7.6bn Dubai Metro, the Phase I Red Line of which started partial operation in September 2009, will be the world's longest driverless rail system on its planned completion in 2011. With a total length of some 75km, it will then overtake the 68.7km Vancouver SkyTrain and be able to carry over 1.2 million passengers on a typical day.
  • Milestone for Northern Powerhouse as UK’s first tram train unveiled
    December 14, 2015
    The UK's first ever tram train has been unveiled in South Yorkshire. Vehicles from this government-funded project are designed to run on both the city’s tramlines and the rail network between Sheffield and Rotherham. This will allow passengers to make single journey between tram stops and conventional rail stations from early 2017, once the works are complete. Prior to this, the tram trains will undergo a period of testing, before being introduced on the Supertram network in summer 2016, to provide extra