Skip to main content

London’s new Cycle Superhighway given the green light

The Mayor of London, Sadiq Khan, and Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.
September 1, 2016 Read time: 2 mins

The Mayor of London, Sadiq Khan, and 1466 Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.

Once complete the full North-South route, also known as Cycle Superhighway 6 (CS6), will provide a safe and direct route for cyclists across central London between Elephant and Castle and King’s Cross. 5km in total, the route will be either fully separated from traffic, or on quiet back streets. At its northern end, the route will connect both with the planned Quietway 2, and Central London Grid routes, allowing cyclists to travel safely to Hackney, Walthamstow, Camden and Swiss Cottage and opening up the city to cycling.

TfL has closely considered all of the responses received in the consultation for this scheme and incorporated several changes to the original plan to address the concerns of local residents and stakeholders. A detailed design will now be developed and, subject to approval from Camden Council and Islington Council, construction will begin in spring 2017.

Pedestrians will also benefit from the plans with 1,600sq metres of new footway along the route as well as 14 new or upgraded signalised pedestrian crossings with tactile paving and pedestrian countdown technology. It will also provide a much improved pedestrian crossing at Farringdon Road for the many thousands of Thameslink passengers who use Farringdon station each day and for those who will use the new Crossrail station in two years’ time.

For more information on companies in this article

Related Content

  • Bloomberg leads cities down cycle path
    October 12, 2022
    Grants of up to $1m will help urban areas improve 'disconnected, incomplete' infrastructure
  • Opening the closed-loop to realise ITS benefits
    April 8, 2014
    Jim Leslie, manager of ITS applications engineering at the Econolite Group looks at practical steps in transitioning from closed-loop masters to a centralised ATMS. Not many years ago the standard method of coordinating signalised intersections in local areas was to install an on-street master – each of which monitored and controlled a limited number of signal controllers or intersections as a closed-loop system. And, to a certain extent, each closed-loop system was autonomous from others deployed by the ag
  • Construction starts on first section of San Diego’s downtown cycle path
    January 7, 2019
    Construction has started on the first phase of San Diego’s Downtown Mobility Plan to help improve safety for cyclists and scooter riders. The 9.3 mile section will feature two-way cycle tracks on major arteries and help provide safer passage from Balboa Park to the San Diego Convention Center. It will be painted green and be separated from vehicular traffic by parked cars, flex posts or grade variations. City mayor Kevin Faulconer says connecting popular destinations in downtown to surrounding neighbour
  • Mersey Gateway tolling system launched
    March 1, 2017
    Tolling arrangements for the new Mersey Gateway in the UK have been announced. Both the new bridge and the Silver Jubilee Bridge will be tolled from autumn 2017. The Mersey Gateway is a new road bridge across the River Mersey and the Manchester Ship Canal in north-west England, which began construction in May 2014.