Skip to main content

London’s first segregated cycle superhighway planned

Thousands of cyclists will no longer have to use the Vauxhall gyratory, one of the most threatening in London, under plans published today for central London’s first segregated cycle superhighway. A continuous two-way and separated east-west track will be built from Kennington Oval to Pimlico, through the gyratory and across Vauxhall Bridge, breaking one of the most significant barriers to cycling in the capital. There will also be substantially more space for pedestrians, with around one square kil
July 9, 2014 Read time: 2 mins
Thousands of cyclists will no longer have to use the 4231 Vauxhall gyratory, one of the most threatening in London, under plans published today for central London’s first segregated cycle superhighway.

A continuous two-way and separated east-west track will be built from Kennington Oval to Pimlico, through the gyratory and across Vauxhall Bridge, breaking one of the most significant barriers to cycling in the capital.

There will also be substantially more space for pedestrians, with around one square kilometre of new footway. The scheme also creates space for new protected north-south routes through the gyratory, the first of which will be installed later in 2015.

The Mayor, Boris Johnson, said: “In my Cycling Vision I promised that the worst and most dangerous junctions would be made safe for cyclists. Vauxhall is the first. In the same week London hosted the Tour de France, I am perhaps even more excited by this scheme, which will help ordinary cyclists every day for years to come.”

Public consultation opens today on the plans and they will be open for comments until 14 September. Subject to responses, work to deliver the scheme could begin in winter 2014.

Leon Daniels, Managing Director of Surface Transport at 1466 Transport for London (TfL), said: “These proposed radical changes would provide a safe and direct route to people travelling through Vauxhall on bicycle, whether they are commuting, exercising or just enjoying being on two wheels. We have worked hard to come up with a scheme to improve facilities for both pedestrians and cyclists throughout this busy area and we would welcome any comments from local residents or road users on these ambitious, but deliverable plans.”

For more information on companies in this article

Related Content

  • Siemens adapts to London Fusion
    September 25, 2020
    New UTC system will be trialled in a 'living lab' at various intersections for TfL
  • Better liveability through more micromobility
    November 1, 2022
    Shared and micromobility offer new options, weaning urbanites off their cars, stitching existing mass transit combinations together. Andrew Stone looks at a report on transforming our cities
  • Uber granted 15-month trial to operate in London
    June 27, 2018
    Uber is now operating in London, UK, on a 15-month licence grant following a decision by Westminster Magistrates Court. The move follows Transport for London’s (TfL’s) refusal to renew the company’s licence in 2017. Chief magistrate Emma Arbuthnot deemed Uber as ‘fit and proper’ and ordered the company to pay TfL’s legal costs of £425,000. The ride-hailing firm claims it has now made substantial changes by replacing senior management.
  • Work to begin on M1 improvements
    December 11, 2013
    Work on the M1 Junction 19 improvement scheme near Catthorpe, Leicestershire, will start in January, UK roads minster Robert Goodwill has announced today. The US$312.7 million scheme will reduce congestion and improve journey time reliability and safety by replacing the existing junction with a three-level junction and improving roads between the villages of Catthorpe and Swinford so local traffic can avoid the junction.