Skip to main content

London’s first segregated cycle superhighway planned

Thousands of cyclists will no longer have to use the Vauxhall gyratory, one of the most threatening in London, under plans published today for central London’s first segregated cycle superhighway. A continuous two-way and separated east-west track will be built from Kennington Oval to Pimlico, through the gyratory and across Vauxhall Bridge, breaking one of the most significant barriers to cycling in the capital. There will also be substantially more space for pedestrians, with around one square kil
July 9, 2014 Read time: 2 mins
Thousands of cyclists will no longer have to use the 4231 Vauxhall gyratory, one of the most threatening in London, under plans published today for central London’s first segregated cycle superhighway.

A continuous two-way and separated east-west track will be built from Kennington Oval to Pimlico, through the gyratory and across Vauxhall Bridge, breaking one of the most significant barriers to cycling in the capital.

There will also be substantially more space for pedestrians, with around one square kilometre of new footway. The scheme also creates space for new protected north-south routes through the gyratory, the first of which will be installed later in 2015.

The Mayor, Boris Johnson, said: “In my Cycling Vision I promised that the worst and most dangerous junctions would be made safe for cyclists. Vauxhall is the first. In the same week London hosted the Tour de France, I am perhaps even more excited by this scheme, which will help ordinary cyclists every day for years to come.”

Public consultation opens today on the plans and they will be open for comments until 14 September. Subject to responses, work to deliver the scheme could begin in winter 2014.

Leon Daniels, Managing Director of Surface Transport at 1466 Transport for London (TfL), said: “These proposed radical changes would provide a safe and direct route to people travelling through Vauxhall on bicycle, whether they are commuting, exercising or just enjoying being on two wheels. We have worked hard to come up with a scheme to improve facilities for both pedestrians and cyclists throughout this busy area and we would welcome any comments from local residents or road users on these ambitious, but deliverable plans.”

For more information on companies in this article

Related Content

  • Cable cars come of age in trans-continental expansion
    April 30, 2015
    David Crawford explores a high-level option of public transport. Sharing its origin with that of ski lifts at winter sports resorts in the European Alps, urban aerial cable transport is attracting growing interest as a low-footprint, low-energy alternative to conventional public transport that can swoop over ground-level traffic congestion.
  • Bombardier to build new London Overground trains
    July 2, 2015
    Transport for London (TfL) has awarded Bombardier a contract to build a new fleet of trains which will see 45 new trains come into service from 2018. The new trains will operate on the Liverpool Street to Enfield Town, Cheshunt (via Seven Sisters) and Chingford routes and the routes between Barking and Gospel Oak and between Romford and Upminster. It will also enable London Overground to improve service frequencies on other routes. The trains will have similar features to the fleet that serves other
  • Vancouver's metro transport promotes alternatives to driving
    January 26, 2012
    David Crawford looks at Vancouver and the legacy of a Olympic transport success
  • Yunex UTC-UX system rolled out across London
    June 7, 2024
    Urban traffic control system operation supports over 15,000 Scoot links in UK capital