Skip to main content

London’s first segregated cycle superhighway planned

Thousands of cyclists will no longer have to use the Vauxhall gyratory, one of the most threatening in London, under plans published today for central London’s first segregated cycle superhighway. A continuous two-way and separated east-west track will be built from Kennington Oval to Pimlico, through the gyratory and across Vauxhall Bridge, breaking one of the most significant barriers to cycling in the capital. There will also be substantially more space for pedestrians, with around one square kil
July 9, 2014 Read time: 2 mins
Thousands of cyclists will no longer have to use the 4231 Vauxhall gyratory, one of the most threatening in London, under plans published today for central London’s first segregated cycle superhighway.

A continuous two-way and separated east-west track will be built from Kennington Oval to Pimlico, through the gyratory and across Vauxhall Bridge, breaking one of the most significant barriers to cycling in the capital.

There will also be substantially more space for pedestrians, with around one square kilometre of new footway. The scheme also creates space for new protected north-south routes through the gyratory, the first of which will be installed later in 2015.

The Mayor, Boris Johnson, said: “In my Cycling Vision I promised that the worst and most dangerous junctions would be made safe for cyclists. Vauxhall is the first. In the same week London hosted the Tour de France, I am perhaps even more excited by this scheme, which will help ordinary cyclists every day for years to come.”

Public consultation opens today on the plans and they will be open for comments until 14 September. Subject to responses, work to deliver the scheme could begin in winter 2014.

Leon Daniels, Managing Director of Surface Transport at 1466 Transport for London (TfL), said: “These proposed radical changes would provide a safe and direct route to people travelling through Vauxhall on bicycle, whether they are commuting, exercising or just enjoying being on two wheels. We have worked hard to come up with a scheme to improve facilities for both pedestrians and cyclists throughout this busy area and we would welcome any comments from local residents or road users on these ambitious, but deliverable plans.”

For more information on companies in this article

Related Content

  • New system to prevent Hazchem and over-height vehicles entering tunnel
    August 20, 2015
    An impending move to free-flow charging prompted a search for automated dangerous goods identification and over-height detection systems at the Thames Crossing to the east of London. Manned toll booths are increasingly being consigned to history by the onslaught of all-electronic charging. However, a secondary function of the traditional manned plazas has been to prevent non-compliant vehicles using the facility or to tell a driver that that they need to use a specific lane or wait for an escort. Automating
  • Contactless payments introduced on London's buses
    December 14, 2012
    Bus passengers in London can now use their use their contactless debit, credit or charge card to touch in on the yellow Oyster card readers and pay the single Oyster fare on any of London's 8,500 buses. Introducing the scheme, Transport for London (TfL) says the new payment option will also be good news for the approximately 36,000 people per day who board a bus and find they have insufficient pay as you go balance on their Oyster to pay for their journey as they will be able to use the other card they may
  • ULEZ: London’s burning issue
    November 3, 2023
    Many Londoners lost their cool during the city’s massive, late-summer ULEZ expansion. Will it be worth the pain and what can other cities learn from it? Andrew Stone assesses the story so far…
  • London’s pedestrian countdown technology to be doubled by summer 2016
    September 11, 2015
    The number of pedestrian countdown sites across London will be doubled by summer 2016, the Mayor and Transport for London (TfL) have confirmed. The technology forms a key part of London’s first Pedestrian Safety Action Plan and replaces the ‘blackout’ period on traffic signals with a numerical counter to show how long pedestrians have left to safely cross the road. The Mayor had set TfL a target of upgrading 400 crossings – 10 per cent of all those in London – with the technology by April 2016. This targ