Skip to main content

London’s first segregated cycle superhighway planned

Thousands of cyclists will no longer have to use the Vauxhall gyratory, one of the most threatening in London, under plans published today for central London’s first segregated cycle superhighway. A continuous two-way and separated east-west track will be built from Kennington Oval to Pimlico, through the gyratory and across Vauxhall Bridge, breaking one of the most significant barriers to cycling in the capital. There will also be substantially more space for pedestrians, with around one square kil
July 9, 2014 Read time: 2 mins
Thousands of cyclists will no longer have to use the 4231 Vauxhall gyratory, one of the most threatening in London, under plans published today for central London’s first segregated cycle superhighway.

A continuous two-way and separated east-west track will be built from Kennington Oval to Pimlico, through the gyratory and across Vauxhall Bridge, breaking one of the most significant barriers to cycling in the capital.

There will also be substantially more space for pedestrians, with around one square kilometre of new footway. The scheme also creates space for new protected north-south routes through the gyratory, the first of which will be installed later in 2015.

The Mayor, Boris Johnson, said: “In my Cycling Vision I promised that the worst and most dangerous junctions would be made safe for cyclists. Vauxhall is the first. In the same week London hosted the Tour de France, I am perhaps even more excited by this scheme, which will help ordinary cyclists every day for years to come.”

Public consultation opens today on the plans and they will be open for comments until 14 September. Subject to responses, work to deliver the scheme could begin in winter 2014.

Leon Daniels, Managing Director of Surface Transport at 1466 Transport for London (TfL), said: “These proposed radical changes would provide a safe and direct route to people travelling through Vauxhall on bicycle, whether they are commuting, exercising or just enjoying being on two wheels. We have worked hard to come up with a scheme to improve facilities for both pedestrians and cyclists throughout this busy area and we would welcome any comments from local residents or road users on these ambitious, but deliverable plans.”

For more information on companies in this article

Related Content

  • Danish cities receive funds for cycle infrastructure
    June 15, 2015
    Three Danish cities have received over US$1.4 million to develop cycling infrastructure. Odense, Faaborg-Midtfyn and Middelfart received the funding from a national transport fund which aims to build bicycle infrastructure, strengthen rural public transport and increase the use of buses across Denmark.
  • On the road with France’s dream peddlers
    September 5, 2022
    Connected cycling is becoming more important in France as the way to keep cyclists from giving up their Covid habit of taking two wheels to work and for pleasure
  • TfL commences consultation on cashless trams
    September 5, 2017
    Transport for London (TfL) has begun an eight-week public consultation on plans to make trams in London ‘cashless’. The proposal would see existing cash ticket machines, which only sell a small number of the more expensive paper tickets every week and do not allow customers to top-up their Oyster card, removed from the tram network. As the ticket machines, which were installed when the tram system opened in 2000, have such low usage and have now reached the end of their useful life
  • New roads targeted in updated Safer Junctions programme
    April 20, 2017
    London’s Walking and Cycling Commissioner, Will Norman, has named the 73 junctions in the Capital with the worst safety records as he unveiled a new approach to delivering improvements for pedestrians and cyclists. Transport for London’s (TfL’s) new analysis uses the last three years of casualty figures on the TfL road network to identify the junctions with the poorest safety records so that they can be targeted for work. This analysis will now continue each year as part of a new approach that will see work