Skip to main content

London invests in bus priority schemes to help keep bus passengers moving

With London’s roads seeing an increase in congestion due to a construction boom and a significant growth in population, Transport for London is investing heavily in helping keep the roads moving through a range of means. Part of this programme is designed to help buses get through congested areas quicker and more reliably. A US$284 million investment in new bus priority schemes in the capital includes changes to road layouts and junctions and enabling small changes to routes so that buses can avoid traff
January 26, 2016 Read time: 2 mins
With London’s roads seeing an increase in congestion due to a construction boom and a significant growth in population, 1466 Transport for London is investing heavily in helping keep the roads moving through a range of means.

Part of this programme is designed to help buses get through congested areas quicker and more reliably. A US$284 million investment in new bus priority schemes in the capital includes changes to road layouts and junctions and enabling small changes to routes so that buses can avoid traffic hotspots.

Around 50 bus priority schemes were delivered across the Capital in 2015 and a total of 116 will be in place by the end of April.  These improvements will benefit passengers in 17 London boroughs right across the Capital.  

Mike Weston, TfL’s director of buses, said: “London’s continued success means that it is a very busy city with a huge range of construction projects underway, particularly in central London, and this is having an effect on traffic.  To ensure that the bus network remains reliable and efficient, we are investing US$284 million in modernising roads across the Capital so that bus passengers can avoid potential delays to their journeys.  Fifty schemes were completed last year and there are dozens more that will be completed over the next few months, ensuring that bus journeys are as quick and easy as possible.

“We’re working 24-hours a day to relieve congestion through our traffic control centre and cracking down on illegal or inconsiderate drivers through our expanded team of dedicated traffic enforcement officers.”

Bus priority schemes are TfL-funded but delivered in partnership with local boroughs, which are often responsible for the local roads that the buses serve and represent the communities around them.

Related Content

  • Personal Rapid Transit, clear benefits for European cities
    July 26, 2012
    David Crawford watches the race to get the world's first PRT system up and running. To paraphrase the old joke about buses bunching, you seem to have to wait several decades for a Personal Rapid Transit (PRT) system, and then half a dozen come along together. Currently, in fact, there are well over that number of schemes for driverless electric passenger-carrying 'pod' networks at various stages of planning, design and implementation around the world. Locations range from a straight-off-the-drawing board ne
  • Tags or communication based toll payment systems?
    January 20, 2012
    Midland Expressway Ltd's Tom Fanning discusses deployment of Near Field Communicationbased payment on the M6 Toll facility The M6 Toll's introduction from early next year of Near Field Communication (NFC) is a pragmatic response to the relative scarcity of tolled facilities and the concomitant low levels of tag take-up in the UK, according to the road's operator, Midland Expressway Ltd (MEL). Nevertheless, Dedicated Short-Range Communication (DSRC)-based tags operating at 5.8GHz are still a key part of the
  • CitySwift puts the Spotlight on Manchester
    August 12, 2024
    Bee Network aims to grow bus use by around to 30% by 2030 from 2022-23 levels
  • Transport integration separates rural idyll from remote isolation
    June 13, 2017
    David Crawford investigates the operation of Total Transport in some of Europe’s more rural areas. Total Transport is a concept that is gaining traction in Europe as a means of making it easier for people without access to a car and living in rural and remote communities, to travel to work, the shops, schools and hospitals. It involves maximising vehicle availability and integrating scheduled services with other transport services (including taxis) commissioned or contracted by more than one local governmen