Skip to main content

Local residents back major safety improvements at Hammersmith gyratory

Transport for London (TfL) has released the results of the Hammersmith gyratory improvement consultation, which received a high level of public support. Nearly 80 per cent of respondents backed TfL’s plans for improvements, which will significantly improve cyclist safety at one of London's most intimidating and busy junctions. Dedicated cycling crossings will be installed, pedestrian facilities will be improved and a new bus lane added that will boost the reliability of bus services for customers. Th
August 8, 2016 Read time: 2 mins
1466 Transport for London (TfL) has released the results of the Hammersmith gyratory improvement consultation, which received a high level of public support.

Nearly 80 per cent of respondents backed TfL’s plans for improvements, which will significantly improve cyclist safety at one of London's most intimidating and busy junctions. Dedicated cycling crossings will be installed, pedestrian facilities will be improved and a new bus lane added that will boost the reliability of bus services for customers.

The direct, kerb-segregated 750 metre two-way route for cyclists will remove the need to cycle around the gyratory, mixing with fast-moving traffic, and will break a key barrier to cycling in west London.

TfL intends to proceed with the changes, but will investigate retaining a pedestrian crossing between the south side of Hammersmith Broadway and Shepherd’s Bush Road following consultation feedback. Construction is set to start next summer and is expected to be completed in summer 2018.

Other improvements include eight cyclist-specific signals at junctions to separate cyclists and motorised vehicles, pedestrian countdown signals at six crossings and a new eastbound cycle track to enable onward connections on the A315 corridor.

TfL is working with the London Borough of Hammersmith & Fulham to develop proposals for cycle improvements along the A315 corridor, which runs through Hammersmith gyratory.

These improvements would provide a continuous cycle route across the whole of the borough and are due for consultation next year. This route would form part of Cycle Superhighway 9 which is still in the early stages of design. It is subject to further work and discussion with stakeholders including the London Boroughs of Hammersmith & Fulham and Hounslow. The changes to the Hammersmith gyratory will be future-proofed to take into account this potential new cycle route and would allow for any long term further transformation of the gyratory.

For more information on companies in this article

Related Content

  • Campaign calls for full funding for metropolitan transport
    February 9, 2015
    A US pressure group is pushing for full funding for metropolitan transport, with a campaign that could have implications for other public transport systems. The Move NY team campaign aims to bring a faster, safer, fairer transportation system to the greater New York metropolitan region. The Metropolitan Transportation Authority (MTA) is responsible for public transportation in the US state of New York, serving 12 counties in south-eastern New York, along with two counties in south-western Connecticut und
  • Louis Berger wins Engineering Excellence Honour Award
    November 13, 2017
    Louis Berger (LB) has won a 2018 Engineering Excellence Honour Award by the American Council of Engineering Companies (ACEC) of Maine for its work on the Adaptive Signal Control (ASC) technology system project in Warwick, Rhode Island. Through a grant sponsored by the Federal Highway Administration(FHWA), the professional services corporation installed the system at eight signalized intersections at the 1.5-mile airport road corridor with the intention of improving traffic and safety.
  • AGD updates AI multimodal detector
    November 13, 2024
    AGD650 now includes advanced tracking capabilities for buses
  • Ticketless travel for London’s commuters?
    April 4, 2013
    London's commuters will be able to use their mobile phones and bank cards for travel across the city, if Transport for London's (TfL) plans come to fruition. Thousands of London bus users already pay their fares using contactless bank cards instead of TfL Oyster cards, which have been widely used over the past decade. Users pay different charges for different London Underground zones and for train travel, so TfL has to decide on suitable payment mechanisms, and could drive the widespread adoption of systems