Skip to main content

Local residents back major safety improvements at Hammersmith gyratory

Transport for London (TfL) has released the results of the Hammersmith gyratory improvement consultation, which received a high level of public support. Nearly 80 per cent of respondents backed TfL’s plans for improvements, which will significantly improve cyclist safety at one of London's most intimidating and busy junctions. Dedicated cycling crossings will be installed, pedestrian facilities will be improved and a new bus lane added that will boost the reliability of bus services for customers. Th
August 8, 2016 Read time: 2 mins
1466 Transport for London (TfL) has released the results of the Hammersmith gyratory improvement consultation, which received a high level of public support.

Nearly 80 per cent of respondents backed TfL’s plans for improvements, which will significantly improve cyclist safety at one of London's most intimidating and busy junctions. Dedicated cycling crossings will be installed, pedestrian facilities will be improved and a new bus lane added that will boost the reliability of bus services for customers.

The direct, kerb-segregated 750 metre two-way route for cyclists will remove the need to cycle around the gyratory, mixing with fast-moving traffic, and will break a key barrier to cycling in west London.

TfL intends to proceed with the changes, but will investigate retaining a pedestrian crossing between the south side of Hammersmith Broadway and Shepherd’s Bush Road following consultation feedback. Construction is set to start next summer and is expected to be completed in summer 2018.

Other improvements include eight cyclist-specific signals at junctions to separate cyclists and motorised vehicles, pedestrian countdown signals at six crossings and a new eastbound cycle track to enable onward connections on the A315 corridor.

TfL is working with the London Borough of Hammersmith & Fulham to develop proposals for cycle improvements along the A315 corridor, which runs through Hammersmith gyratory.

These improvements would provide a continuous cycle route across the whole of the borough and are due for consultation next year. This route would form part of Cycle Superhighway 9 which is still in the early stages of design. It is subject to further work and discussion with stakeholders including the London Boroughs of Hammersmith & Fulham and Hounslow. The changes to the Hammersmith gyratory will be future-proofed to take into account this potential new cycle route and would allow for any long term further transformation of the gyratory.

For more information on companies in this article

Related Content

  • Technology and finance shapes up to make MaaS happen
    June 7, 2017
    The technology and finance aspects needed for Mobility as a Service (MaaS) to become widely adopted are taking shape as Geoff Hadwick and Colin Sowman hear. Sampo Hietanen, CEO of MaaS Global and ‘father’ of MaaS, started his address to ITS International’s recent MaaS Market conference in London by saying: “All of the problems that can be solved by a company or group of companies have already been solved, and now we are left with the big ones such as housing, transport and health. He called MaaS the “Netfli
  • New York's award-winning traffic control system
    February 28, 2013
    A comprehensive ITS strategy in New York built on a system of key building blocks has been crowned with an IRF award for the city’s Midtown in Motion adaptive control system. Jon Masters reviews New York’s ITS modernisation plan as the city looks to the next phase of expansion. In January this year the International Road Federation (IRF) presented TransCore and the New York City Department of Transportation (NYCDOT) with the IRF Global Road Achievement Award. This was for deployment of New York’s Midtown in
  • Viaduct deck renewal creates detour dilemma for MassDOT
    May 26, 2016
    As the deck renewal of the I-91 viaduct in Springfield gets underway, David Crawford looks at the preparation and planning to ease the resulting traffic congestion. Accommodating the deck renewal of a 4km-long/four-lanes in each direction viaduct in the heart of Springfield (Massachusetts’ third largest city), has involved the state’s Department of Transportation (MassDOT) in a massive exercise in transport research and ITS-based area-wide preplanning and traffic management. Supporting a workzone of well ab
  • Germany's approach to adaptive traffic control
    February 3, 2012
    Jürgen Mück, Siemens AG, describes the three-level approach taken in Germany to adaptive network control