Skip to main content

Local residents back major safety improvements at Hammersmith gyratory

Transport for London (TfL) has released the results of the Hammersmith gyratory improvement consultation, which received a high level of public support. Nearly 80 per cent of respondents backed TfL’s plans for improvements, which will significantly improve cyclist safety at one of London's most intimidating and busy junctions. Dedicated cycling crossings will be installed, pedestrian facilities will be improved and a new bus lane added that will boost the reliability of bus services for customers. Th
August 8, 2016 Read time: 2 mins
1466 Transport for London (TfL) has released the results of the Hammersmith gyratory improvement consultation, which received a high level of public support.

Nearly 80 per cent of respondents backed TfL’s plans for improvements, which will significantly improve cyclist safety at one of London's most intimidating and busy junctions. Dedicated cycling crossings will be installed, pedestrian facilities will be improved and a new bus lane added that will boost the reliability of bus services for customers.

The direct, kerb-segregated 750 metre two-way route for cyclists will remove the need to cycle around the gyratory, mixing with fast-moving traffic, and will break a key barrier to cycling in west London.

TfL intends to proceed with the changes, but will investigate retaining a pedestrian crossing between the south side of Hammersmith Broadway and Shepherd’s Bush Road following consultation feedback. Construction is set to start next summer and is expected to be completed in summer 2018.

Other improvements include eight cyclist-specific signals at junctions to separate cyclists and motorised vehicles, pedestrian countdown signals at six crossings and a new eastbound cycle track to enable onward connections on the A315 corridor.

TfL is working with the London Borough of Hammersmith & Fulham to develop proposals for cycle improvements along the A315 corridor, which runs through Hammersmith gyratory.

These improvements would provide a continuous cycle route across the whole of the borough and are due for consultation next year. This route would form part of Cycle Superhighway 9 which is still in the early stages of design. It is subject to further work and discussion with stakeholders including the London Boroughs of Hammersmith & Fulham and Hounslow. The changes to the Hammersmith gyratory will be future-proofed to take into account this potential new cycle route and would allow for any long term further transformation of the gyratory.

Related Content

  • May 31, 2013
    Driverless vehicles will cause changes in society
    Paul Godsmark gives his views on what the advent of autonomous vehicles would mean for the wider society. Further to your article ‘Driver not required…’ in the Jan/Feb edition of ITS International which gave some great background to autonomous road vehicle (ARVs), I feel that the bigger picture is needed to aid understanding. There is a ‘technology freight train’ heading our way that is going to transform our roadways but we don’t seem to be aware of it and, therefore, are in no hurry to react.
  • June 17, 2021
    Vivacity sheds light on cycle routes 
    Councils in 30 sites near London, UK, will use Vivacity's AI and IoT data and sensors
  • April 25, 2012
    Improving traffic flow with automated urban traffic control
    Alterations to traffic signals and variable message signs are being activated to reduce congestion as soon as it occurs, through a pioneering fully automatic UTC system. Jon Masters reports In the South Yorkshire town of Barnsley in England, strategies for dealing with traffic congestion have been devised from analysis of queue data, then made to work automatically: “This represents the future of ITS for urban traffic control,” says Siemens Consultancy Services senior engineer David Carr. Over a career span
  • April 7, 2017
    Highways England announces funding to improve major motorway junction
    Highways England has announced plans to invest total of US$3.7 million (£3 million) for major improvements to Switch Island in Merseyside, one of the north-west’s busiest motorway junctions where the M57, M58 and three A roads connect. Construction work at the junction, which is used by over 90,000 vehicles every day, is expected to start next year. The scheme is designed to improve the flow of traffic and enhance safety, following 49 collisions at the junction in the past two years. New traffic light