Skip to main content

Local residents back major safety improvements at Hammersmith gyratory

Transport for London (TfL) has released the results of the Hammersmith gyratory improvement consultation, which received a high level of public support. Nearly 80 per cent of respondents backed TfL’s plans for improvements, which will significantly improve cyclist safety at one of London's most intimidating and busy junctions. Dedicated cycling crossings will be installed, pedestrian facilities will be improved and a new bus lane added that will boost the reliability of bus services for customers. Th
August 8, 2016 Read time: 2 mins
1466 Transport for London (TfL) has released the results of the Hammersmith gyratory improvement consultation, which received a high level of public support.

Nearly 80 per cent of respondents backed TfL’s plans for improvements, which will significantly improve cyclist safety at one of London's most intimidating and busy junctions. Dedicated cycling crossings will be installed, pedestrian facilities will be improved and a new bus lane added that will boost the reliability of bus services for customers.

The direct, kerb-segregated 750 metre two-way route for cyclists will remove the need to cycle around the gyratory, mixing with fast-moving traffic, and will break a key barrier to cycling in west London.

TfL intends to proceed with the changes, but will investigate retaining a pedestrian crossing between the south side of Hammersmith Broadway and Shepherd’s Bush Road following consultation feedback. Construction is set to start next summer and is expected to be completed in summer 2018.

Other improvements include eight cyclist-specific signals at junctions to separate cyclists and motorised vehicles, pedestrian countdown signals at six crossings and a new eastbound cycle track to enable onward connections on the A315 corridor.

TfL is working with the London Borough of Hammersmith & Fulham to develop proposals for cycle improvements along the A315 corridor, which runs through Hammersmith gyratory.

These improvements would provide a continuous cycle route across the whole of the borough and are due for consultation next year. This route would form part of Cycle Superhighway 9 which is still in the early stages of design. It is subject to further work and discussion with stakeholders including the London Boroughs of Hammersmith & Fulham and Hounslow. The changes to the Hammersmith gyratory will be future-proofed to take into account this potential new cycle route and would allow for any long term further transformation of the gyratory.

Related Content

  • October 15, 2013
    Transport for London awards EQM contract
    Passengerfta is to supply Transport for London (TfL) with engineering quality monitoring (EQM) and will carry out quality monitoring inspections and audits on London’s 8,500-strong bus fleet. As part of the Freight Transport Association (FTA), Passengerfta offers a range of services designed for passenger carrying vehicle (PCV) operators and carries out thousands of PSV inspections throughout the United Kingdom and Eire every year.
  • June 16, 2015
    Rediweld slims down cycle lane separators
    Rediweld has introduced a new narrower version of its surface-mounted Orca cycle lane separator called the Orca Kerb which is only 150mm wide rather than 200mm as in the original unit. On the cycle side of the 100mm high Orca Kerb is a splayed face to guide a cycle tyre back into the lane rather than tripping the cyclists, while on the traffic side is a vertical half-battered face to deter vehicles crossing into the cycle lane. Also unlike the original, the recycled rubber Orca Kerb comes in lengths of up
  • March 28, 2014
    Siemens systems for Nottingham trams, Dubai metro
    Construction work has started on Nottingham's expanding tram network to extend the service to the south and southwest of the city. The extension will more than double the size of Nottingham's tram network with 17.5 kilometres of new track and 28 new tram stops. As part of the project, Siemens will supply and install 33 new ST950 extra low voltage (ELV) junction controllers, eight signalised pedestrian crossings and 80 ELV tram signals. Junction controllers at a number of existing sites will also be upgra
  • September 1, 2017
    Major road projects to improve journeys in Merseyside and Cheshire
    Two major new road schemes worth more than US$388 million (£300 million) are set to cut congestion and improve journey times for hundreds of thousands of drivers in Merseyside and Cheshire, UK. Highways England has set out its preferred options for upgrading the key route to the Port of Liverpool and creating a new junction on the M56 near Runcorn following public consultations earlier this year.