Skip to main content

Local residents back major safety improvements at Hammersmith gyratory

Transport for London (TfL) has released the results of the Hammersmith gyratory improvement consultation, which received a high level of public support. Nearly 80 per cent of respondents backed TfL’s plans for improvements, which will significantly improve cyclist safety at one of London's most intimidating and busy junctions. Dedicated cycling crossings will be installed, pedestrian facilities will be improved and a new bus lane added that will boost the reliability of bus services for customers. Th
August 8, 2016 Read time: 2 mins
1466 Transport for London (TfL) has released the results of the Hammersmith gyratory improvement consultation, which received a high level of public support.

Nearly 80 per cent of respondents backed TfL’s plans for improvements, which will significantly improve cyclist safety at one of London's most intimidating and busy junctions. Dedicated cycling crossings will be installed, pedestrian facilities will be improved and a new bus lane added that will boost the reliability of bus services for customers.

The direct, kerb-segregated 750 metre two-way route for cyclists will remove the need to cycle around the gyratory, mixing with fast-moving traffic, and will break a key barrier to cycling in west London.

TfL intends to proceed with the changes, but will investigate retaining a pedestrian crossing between the south side of Hammersmith Broadway and Shepherd’s Bush Road following consultation feedback. Construction is set to start next summer and is expected to be completed in summer 2018.

Other improvements include eight cyclist-specific signals at junctions to separate cyclists and motorised vehicles, pedestrian countdown signals at six crossings and a new eastbound cycle track to enable onward connections on the A315 corridor.

TfL is working with the London Borough of Hammersmith & Fulham to develop proposals for cycle improvements along the A315 corridor, which runs through Hammersmith gyratory.

These improvements would provide a continuous cycle route across the whole of the borough and are due for consultation next year. This route would form part of Cycle Superhighway 9 which is still in the early stages of design. It is subject to further work and discussion with stakeholders including the London Boroughs of Hammersmith & Fulham and Hounslow. The changes to the Hammersmith gyratory will be future-proofed to take into account this potential new cycle route and would allow for any long term further transformation of the gyratory.
UTC

Related Content

  • September 15, 2014
    CCTV brings transit safety into view
    David Crawford looks at camera-based vulnerable road users protection systems.Safe and efficient operation of road-based transit depends on minimising the risks of incidents involving other vehicles or vulnerable road users such as pedestrians, cyclists and passengers boarding or alighting from buses or trams. The extent and quality of the visibility available to drivers is crucial in preventing and avoiding incidents. Conventionally, they have had to rely on fairly basic equipment - essentially the human
  • May 17, 2012
    Two initiatives announced to cut road works disruption in London
    A joint US$1.6 million fund to research and develop new technology to reduce the disruption caused by road works was announced yesterday by UK Transport Secretary, Philip Hammond and the Mayor of London, Boris Johnson. Confirmation of a lane rental scheme for roadworks was also announced at the same time.
  • March 19, 2014
    Highways Agency plans to increase capacity of M4
    The UK Highways Agency is holding a series of public exhibitions to inform road users, local residents and businesses about proposals to transform the M4 into one of the longest stretches of ‘smart motorway’ in England by 2021. The improvement, on a 32-mile stretch between junction 3 at Hayes in London, and junction 12 at Theale in Berkshire, would increase capacity, improve journey reliability and maintain safety. The proposals are part of the Government’s investment into England’s motorways and majo
  • August 8, 2014
    Balfour Beatty awarded Hull improvement contract
    Balfour Beatty’s UK construction business today announces the award of the £75 million A63 Castle Street Hull improvement scheme for the Highways Agency under an Early Contractor Involvement (ECI) design and build contract.