Skip to main content

Local residents back major safety improvements at Hammersmith gyratory

Transport for London (TfL) has released the results of the Hammersmith gyratory improvement consultation, which received a high level of public support. Nearly 80 per cent of respondents backed TfL’s plans for improvements, which will significantly improve cyclist safety at one of London's most intimidating and busy junctions. Dedicated cycling crossings will be installed, pedestrian facilities will be improved and a new bus lane added that will boost the reliability of bus services for customers. Th
August 8, 2016 Read time: 2 mins
1466 Transport for London (TfL) has released the results of the Hammersmith gyratory improvement consultation, which received a high level of public support.

Nearly 80 per cent of respondents backed TfL’s plans for improvements, which will significantly improve cyclist safety at one of London's most intimidating and busy junctions. Dedicated cycling crossings will be installed, pedestrian facilities will be improved and a new bus lane added that will boost the reliability of bus services for customers.

The direct, kerb-segregated 750 metre two-way route for cyclists will remove the need to cycle around the gyratory, mixing with fast-moving traffic, and will break a key barrier to cycling in west London.

TfL intends to proceed with the changes, but will investigate retaining a pedestrian crossing between the south side of Hammersmith Broadway and Shepherd’s Bush Road following consultation feedback. Construction is set to start next summer and is expected to be completed in summer 2018.

Other improvements include eight cyclist-specific signals at junctions to separate cyclists and motorised vehicles, pedestrian countdown signals at six crossings and a new eastbound cycle track to enable onward connections on the A315 corridor.

TfL is working with the London Borough of Hammersmith & Fulham to develop proposals for cycle improvements along the A315 corridor, which runs through Hammersmith gyratory.

These improvements would provide a continuous cycle route across the whole of the borough and are due for consultation next year. This route would form part of Cycle Superhighway 9 which is still in the early stages of design. It is subject to further work and discussion with stakeholders including the London Boroughs of Hammersmith & Fulham and Hounslow. The changes to the Hammersmith gyratory will be future-proofed to take into account this potential new cycle route and would allow for any long term further transformation of the gyratory.
UTC

Related Content

  • October 8, 2015
    PTV Group retains TfL modelling software contract
    PTV Group has been appointed as one of the framework contractors for three years to provide tactical and microsimulation operational modelling software to Transport for London (TfL). TfL uses PTV Visum operational software for the development of the Operational Network Evaluation (ONE) model, a tactical highway assignment model for London, said to be the largest of its type in the world. An earlier version of the ONE model, covering the central London road network, was successfully used for the operatio
  • July 1, 2014
    Plans for new Thames crossing unveiled
    On the 120th anniversary of the completion of London’s Tower Bridge, Arup, along with architects HOK, has unveiled its plans for a new bridge across the River Thames. The US$1 billion concept, called ‘Bridge East London’, would help transform leisure and business travel and enhance life in the east of the capital. It suggests a new road bridge over the River Thames, linking Beckton and Thamesmead at Gallions Reach. The proposed bridge would allow clear passage for ships and takes into account aircraf
  • August 20, 2013
    TfL consults on proposals to withdraw cash fare payments
    Transport for London (TfL) has launched a public consultation to seek customers’ views on proposals to withdraw cash fare payments on London buses. Since the introduction of the Oyster card in 2003, and the launch of contactless payment cards on London’s buses last year, fewer than one per cent of bus fares are now paid in cash, down from 25 per cent in 2000. TfL is now putting proposals to passengers that would see cash fare payments on London buses ending in 2014. Research shows that the majori
  • January 25, 2018
    Cyclists celebrate safety improved junction in Ellesmere Port
    Members of the Chester Cycling Campaign are among the first to ride along Highways England’s (HE’s) £1.1m ($1.5m) safety-enhanced cycle path located at the Two Mills junction in Cheshire. The project is part of a £100m ($142m) government investment across England to make it easier for cyclists to cross motorway junctions and use major A roads.