Skip to main content

Local residents back major safety improvements at Hammersmith gyratory

Transport for London (TfL) has released the results of the Hammersmith gyratory improvement consultation, which received a high level of public support. Nearly 80 per cent of respondents backed TfL’s plans for improvements, which will significantly improve cyclist safety at one of London's most intimidating and busy junctions. Dedicated cycling crossings will be installed, pedestrian facilities will be improved and a new bus lane added that will boost the reliability of bus services for customers. Th
August 8, 2016 Read time: 2 mins
1466 Transport for London (TfL) has released the results of the Hammersmith gyratory improvement consultation, which received a high level of public support.

Nearly 80 per cent of respondents backed TfL’s plans for improvements, which will significantly improve cyclist safety at one of London's most intimidating and busy junctions. Dedicated cycling crossings will be installed, pedestrian facilities will be improved and a new bus lane added that will boost the reliability of bus services for customers.

The direct, kerb-segregated 750 metre two-way route for cyclists will remove the need to cycle around the gyratory, mixing with fast-moving traffic, and will break a key barrier to cycling in west London.

TfL intends to proceed with the changes, but will investigate retaining a pedestrian crossing between the south side of Hammersmith Broadway and Shepherd’s Bush Road following consultation feedback. Construction is set to start next summer and is expected to be completed in summer 2018.

Other improvements include eight cyclist-specific signals at junctions to separate cyclists and motorised vehicles, pedestrian countdown signals at six crossings and a new eastbound cycle track to enable onward connections on the A315 corridor.

TfL is working with the London Borough of Hammersmith & Fulham to develop proposals for cycle improvements along the A315 corridor, which runs through Hammersmith gyratory.

These improvements would provide a continuous cycle route across the whole of the borough and are due for consultation next year. This route would form part of Cycle Superhighway 9 which is still in the early stages of design. It is subject to further work and discussion with stakeholders including the London Boroughs of Hammersmith & Fulham and Hounslow. The changes to the Hammersmith gyratory will be future-proofed to take into account this potential new cycle route and would allow for any long term further transformation of the gyratory.
UTC

Related Content

  • August 19, 2014
    Upgrade for London’s traffic signals
    Technology services company, telent, along with three other suppliers, has been awarded a contract worth well over US$166.5 million from Transport for London (TfL). The overall contract is an eight-year agreement that will see the capital's 6,000 traffic signals upgraded and maintained to the latest, greenest standards. telent's contract is believed to be the largest single traffic signal supply and maintenance contract ever awarded in the UK. Telent will supply, install and maintain all traffic control
  • September 18, 2014
    TfL upgrades London’s speed and red light safety cameras
    Transport for London (TfL) has begun work on a programme to overhaul the capital’s road safety camera network; replacing hundreds of old wet film cameras with modern and more efficient digital safety cameras in order to help further reduce casualties on London’s roads. According to TfL, safety cameras have proved successful in reducing road casualties in recent years. At locations where safety cameras operate in the capital, research shows that the number of people killed or seriously injured (KSI) fell
  • May 2, 2014
    New changes could cut Britain's 4.6 million road signs
    New plans to allow local councils in Great Britain the freedom to cut down the number of road markings and signs have been announced by Roads Minister Robert Goodwill. The changes are included in a new consultation which also contains proposals for clearer road markings and new low-level signals for cyclists which will help improve safety on the roads.
  • April 25, 2024
    Cash for Southern Nevada bus rapid transit
    Maryland Parkway Bus project received $150m from the US government