Skip to main content

Local residents back major safety improvements at Hammersmith gyratory

Transport for London (TfL) has released the results of the Hammersmith gyratory improvement consultation, which received a high level of public support. Nearly 80 per cent of respondents backed TfL’s plans for improvements, which will significantly improve cyclist safety at one of London's most intimidating and busy junctions. Dedicated cycling crossings will be installed, pedestrian facilities will be improved and a new bus lane added that will boost the reliability of bus services for customers. Th
August 8, 2016 Read time: 2 mins
1466 Transport for London (TfL) has released the results of the Hammersmith gyratory improvement consultation, which received a high level of public support.

Nearly 80 per cent of respondents backed TfL’s plans for improvements, which will significantly improve cyclist safety at one of London's most intimidating and busy junctions. Dedicated cycling crossings will be installed, pedestrian facilities will be improved and a new bus lane added that will boost the reliability of bus services for customers.

The direct, kerb-segregated 750 metre two-way route for cyclists will remove the need to cycle around the gyratory, mixing with fast-moving traffic, and will break a key barrier to cycling in west London.

TfL intends to proceed with the changes, but will investigate retaining a pedestrian crossing between the south side of Hammersmith Broadway and Shepherd’s Bush Road following consultation feedback. Construction is set to start next summer and is expected to be completed in summer 2018.

Other improvements include eight cyclist-specific signals at junctions to separate cyclists and motorised vehicles, pedestrian countdown signals at six crossings and a new eastbound cycle track to enable onward connections on the A315 corridor.

TfL is working with the London Borough of Hammersmith & Fulham to develop proposals for cycle improvements along the A315 corridor, which runs through Hammersmith gyratory.

These improvements would provide a continuous cycle route across the whole of the borough and are due for consultation next year. This route would form part of Cycle Superhighway 9 which is still in the early stages of design. It is subject to further work and discussion with stakeholders including the London Boroughs of Hammersmith & Fulham and Hounslow. The changes to the Hammersmith gyratory will be future-proofed to take into account this potential new cycle route and would allow for any long term further transformation of the gyratory.

For more information on companies in this article

Related Content

  • Nissan using anthropologist to develop proPILOT autonomous vehicle
    August 17, 2016
    Nissan is using an array of technical talent to develop its next generation autonomous vehicle, including automobile and software engineers, experts on sensor technology and artificial intelligence, computer scientists, production specialists an anthropologist. Melissa Cefkin, principal scientist and design anthropologist at the Nissan Research Center in Silicon Valley is playing a key role in the project, analysing human driving interactions to ensure that it is prepared to be a ‘good citizen’ on the ro
  • EU releases first transport infrastructure funds
    April 8, 2014
    Following its decision in March to make the first US$16.4 billion tranche of funding available for trans-European transport network projects, the European commission has now adopted the first work programmes within this framework: a multi-annual work programme covering larger projects with a total budget of US$15.1 billion and an annual work programme for 2014 addressing smaller projects with a budget of US1.3 billion. The funding priorities set out in these programmes include: The closing of missing lin
  • Worcester transport project given go-ahead
    February 21, 2013
    A $US30 million plan to improve transport links in the UK town of Worcester has been given the go-ahead by local transport minister Norman Baker. The government is backing it with US22 million of funding. The project will improve access to rail travel, upgrade traffic signals and make it easier to walk and cycle in the area. Intelligent transport systems which provide better information to bus passengers and road users will also be installed and a smarter choice scheme will encourage transport users to look
  • Melbourne metro funding fast-tracked
    February 16, 2015
    Work has begun on one of Australia’s largest infrastructure projects: two nine-kilometre underground rail tunnels that will transform Melbourne’s public transport system. The Victoria government has fast-tracked US$31 million to establish the Melbourne Metro Rail Authority and start work on the project as soon as possible. The project also includes five new underground stations. The Authority will oversee immediate planning works, complete development of the reference design and undertake detailed site inve