Skip to main content

Lighting upgrade completed on UK motorway

UK civil and electrical engineering firm, McCann, has completed the lighting upgrades on a 19km stretch of the M62 motorway between J22-25, replacing 1,224 existing high pressure sodium lanterns with new Ampera Maxi LED lighting units. The project, coordinated by Highways England’s term contractor A-one+, also included the installation of a new central management system, with remote manipulation of operational burn hours, control over the timing of dimmed lighting when there is minimal traffic and fault mon
May 18, 2017 Read time: 1 min
UK civil and electrical engineering firm, McCann, has completed the lighting upgrades on a 19km stretch of the M62 motorway between J22-25, replacing 1,224 existing high pressure sodium lanterns with new Ampera Maxi LED lighting units.


The project, coordinated by 8101 Highways England’s term contractor A-one+, also included the installation of a new central management system, with remote manipulation of operational burn hours, control over the timing of dimmed lighting when there is minimal traffic and fault monitoring and energy consumption tracking systems. The reporting and control mechanisms can also be operated on a light-by-light basis or across the entire network.

According to McCann, the newly-installed LED lights require no routine maintenance, cutting down on man-hours required in order to keep them operational, while generating a 53 per cent energy saving and reducing annual energy consumption from 2,203,807 kWhrs to 1,041,658 kWhrs.

For more information on companies in this article

Related Content

  • TWM wins UK traffic sign deal
    March 1, 2021
    Firm to supply and install all electronic vehicle-activated signage in England’s Wirral
  • How typical?
    July 30, 2012
    Deployment of solar-powered LED road studs has provided significant cost benefits whilst reducing KSIs on notorious routes in South Africa. Can these results be replicated in other regions of the world and on less notorious stretches of road? According to Kevin Adams, Astucia's CEO, they can.
  • I-80 Smart Corridor sets the ITS standard for California's Bay Area
    March 23, 2015
    Colin Sowman looks at California’s ‘smartest’ road which will open this spring to counter congestion and accidents on one of the Bay Area’s busiest interstates. Interstate 80 (I-80) is one of the busiest roads in the San Francisco Bay area with up to 270,000 vehicles using the corridor every day. The section between the Carquinez Bridge in Crockett and the Bay Bridge not only suffers congestion during the working week but also at weekends. Traditional remedies such as building additional lanes (there are al
  • I-80 Smart Corridor sets the ITS standard for California's Bay Area
    March 23, 2015
    Colin Sowman looks at California’s ‘smartest’ road which will open this spring to counter congestion and accidents on one of the Bay Area’s busiest interstates. Interstate 80 (I-80) is one of the busiest roads in the San Francisco Bay area with up to 270,000 vehicles using the corridor every day. The section between the Carquinez Bridge in Crockett and the Bay Bridge not only suffers congestion during the working week but also at weekends. Traditional remedies such as building additional lanes (there are al