Skip to main content

Lighting upgrade completed on UK motorway

UK civil and electrical engineering firm, McCann, has completed the lighting upgrades on a 19km stretch of the M62 motorway between J22-25, replacing 1,224 existing high pressure sodium lanterns with new Ampera Maxi LED lighting units. The project, coordinated by Highways England’s term contractor A-one+, also included the installation of a new central management system, with remote manipulation of operational burn hours, control over the timing of dimmed lighting when there is minimal traffic and fault mon
May 18, 2017 Read time: 1 min
UK civil and electrical engineering firm, McCann, has completed the lighting upgrades on a 19km stretch of the M62 motorway between J22-25, replacing 1,224 existing high pressure sodium lanterns with new Ampera Maxi LED lighting units.


The project, coordinated by 8101 Highways England’s term contractor A-one+, also included the installation of a new central management system, with remote manipulation of operational burn hours, control over the timing of dimmed lighting when there is minimal traffic and fault monitoring and energy consumption tracking systems. The reporting and control mechanisms can also be operated on a light-by-light basis or across the entire network.

According to McCann, the newly-installed LED lights require no routine maintenance, cutting down on man-hours required in order to keep them operational, while generating a 53 per cent energy saving and reducing annual energy consumption from 2,203,807 kWhrs to 1,041,658 kWhrs.

For more information on companies in this article

Related Content

  • Drivers urged: ‘Don’t put road workers lives at risk’
    May 23, 2018
    A road junction in Merseyside, UK, has become a hotspot for life-threatening incidents to construction workers, says Highways England. Contractors have reported 23 incidents in two months where their safety has been put at risk by drivers ignoring overnight closures. Road users have driven into roadworks for the £3m improvement project at Switch Island, where the M57, M58 and three A roads all join. One lorry driver travelled through the construction area without stopping - forcing workers to get out
  • Jenoptik supplies sophisticated multi-section control project
    November 17, 2014
    Efficient speed enforcement in the most highly frequented tunnel in Austria on the A7 near Linz. The Bindermichl-Niedernhart tunnel complex on Austrian highway A7 connects the major east/west A1 route from Vienna/ Bratislava to Munich/Salzburg with the A7/ E55 running south from Prague in the Czech Republic. This happens right in the middle of the city of Linz, Austria.
  • Wireless bridges widen options for ITS upgrades
    December 9, 2014
    Antaira Technologies’ marketing engineer Brian Roth explains why the increasing capacity of wireless bridges is reducing the cost of expanding and upgrading ITS networks. With more than half of the world’s population now living in cities, the need for efficient transportation of both people and goods has never been greater and that pressure is unlikely to ease any time soon. Indeed in many regions of the world the rate of urbanisation is still increasing as the demand for rural workers continues to decline.
  • Smoothing the path to reducing traffic pollution
    October 22, 2014
    David Crawford reviews a new approach to traffic smoothing. A key objective for the Californian city of Bakersfield’s upgraded traffic operations centre (TOC), which opened in June 2014, is to help improve living conditions in a region with one of the worst air quality problems in the US. The TOC is speeding up the smoothing of traffic flows by delivering faster and better-informed traffic signal retiming and synchronisation.