Skip to main content

Lighting upgrade completed on UK motorway

UK civil and electrical engineering firm, McCann, has completed the lighting upgrades on a 19km stretch of the M62 motorway between J22-25, replacing 1,224 existing high pressure sodium lanterns with new Ampera Maxi LED lighting units. The project, coordinated by Highways England’s term contractor A-one+, also included the installation of a new central management system, with remote manipulation of operational burn hours, control over the timing of dimmed lighting when there is minimal traffic and fault mon
May 18, 2017 Read time: 1 min
UK civil and electrical engineering firm, McCann, has completed the lighting upgrades on a 19km stretch of the M62 motorway between J22-25, replacing 1,224 existing high pressure sodium lanterns with new Ampera Maxi LED lighting units.


The project, coordinated by 8101 Highways England’s term contractor A-one+, also included the installation of a new central management system, with remote manipulation of operational burn hours, control over the timing of dimmed lighting when there is minimal traffic and fault monitoring and energy consumption tracking systems. The reporting and control mechanisms can also be operated on a light-by-light basis or across the entire network.

According to McCann, the newly-installed LED lights require no routine maintenance, cutting down on man-hours required in order to keep them operational, while generating a 53 per cent energy saving and reducing annual energy consumption from 2,203,807 kWhrs to 1,041,658 kWhrs.

For more information on companies in this article

Related Content

  • SmogStop aims to clear the air
    February 17, 2020
    Air quality is an increasing issue for the ITS industry - but Envision SQ has something which can work alongside traffic calming measures to cut emissions
  • Future EV owners can make money from the power grid
    May 17, 2012
    In what is being claimed as a landmark research report published by Ricardo and National Grid in the UK, the market potential is demonstrated for an electric plug-in vehicle fleet of the future to provide balancing services to the power grid on a commercial basis, returning value to vehicle owners while improving the carbon efficiency of grid operation.
  • Triplesign shows new road warning system
    April 18, 2024
    A new road warning system from Triplesign is said to improve safety for drivers, while offering lower costs for users. Using prismatic technology rather than LEDs, working life is high while power use is minimal for this variable message sign (VMS) package.
  • Low power retrofit LED wait indicators from Siemens
    January 7, 2013
    Siemens’ new energy saving LED pedestrian crossing wait indicator retrofit solution allows both Siemens and Peek 48 volt incandescent wait indicators to be upgraded to the latest Central Light Source (CLS) LED technology, says the company. Siemens claim the low power consumption the solution offers power savings typically in excess of 70% and represents a highly cost effective upgrade option for existing wait indicators, particularly when undertaken alongside a wider LED traffic signal upgrade program. The